Annual Water Treatment Plant High Service Pump Maintenance Contractor
- Response deadline
- Oct 29, 2026 Due in 23 days
- Date posted
- Oct 5, 2026
- Source
- Open notice
Description
The City of Lakeland Water Utilities Department is seeking the services of a qualified and experienced Peerless & Flowserve pump contractor to provide annual inspection, maintenance, repair, and testing services for vertical turbine & split case horizontal high service pumps located at the T.B. Williams and C. Wayne Combee Water Treatment Plants, as well as the Highlands, Southwest & Southeast Booster Stations. The selected contractor shall possess demonstrated expertise in vertical turbine pump systems and provide preventative maintenance services to ensure reliable operation and minimize downtime of critical water production and distribution equipment. THIS RFP SHALL RESULT IN A ONE (1) YEAR CONTRACT WITH AN OPTION FOR FOUR (4), ONE (1) YEAR RENEWALS UPON MUTUAL CONSENT.
Documents
No documents posted for this opportunity.