Air Traffic Control Tower Rehabilitation
- Response deadline
- Aug 14, 2026 Due in 18 days
- Date posted
- Jul 27, 2026
- Source
- Open notice
Description
This project includes the Rehabilitation of the Air Traffic Control Tower (ATCT) and supporting infrastructure at the Flagler Executive Airport. This project may include, but is not limited to; building envelope repair and repainting, structural repairs and structural improvements to the ATCT structure and tower cab catwalk, Tower cab carpet/cabinet/countertop replacement, Tower cab ceiling repairs and repainting, replacement of roof hatches, replacement of air conditioning systems (7 PTAC's and 2 RTU's), painting of the interior of the Tower cab and vestibule, and access control upgrades to consolidate the vehicular access gate, Tower entry door, and Tower elevator under a single card system. Depending upon the availability of funding, the project may also include upgrades to hand railings, the addition of up-lighting on the Tower exterior, replacement of the vehicular gate operator, repainting of bollards, and seal coating/re-striping the ATCT parking lot inside of the ATCT security fencing. A Design Criteria Package (DCP) has been provided as the primary design document for the solicitation. The DCP contains the directives, specifications, and details necessary to provide pricing for this invitation to bid.
Documents
No documents posted for this opportunity.
Similar contracts
- Flagler Executive Airport Wildlife Hazard FenceFLDue Jun 30, 2026