Duct-Less HVAC Installation
- Response deadline
- Aug 21, 2026 Due in 2 days
- Date posted
- Aug 19, 2026
- Source
- Open notice
Description
Amendment_04 Attached the updated Statement of Work. Notable changes include the removal of sub-panel installation as well as the inclusion of demolition and removal of the existing systems. Amendment_03 Providing an extension to give time for potential updates to quotes after adjustments to the SOW are posted following the Site Visit. // Amendment_02: Contractor Q and A added as well as new photo attachments. SITE VISIT SCHEDULED for Wednesday 12 August at 1:00PM CST. Provide a valid Drivers License number and picture for all those meaning to attend. If you cannot provide an image then please provide your full name and DoB in addition to your drivers license number. // Amendment_01: Solicitation Updated to Extend Quote Submission Date to 14 August 12:30 CST. // Requirement to source and install (2) complete 0.75-ton ductless mini-split systems meeting the specifications outlined in the SOW. Brand Name or Equal.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
- kodei.calvin@us.af.mil850-884-7619
Similar contracts
- Acquisition of Fan Coil UnitsAşgabatDue Sep 3, 2026
- N041--Building 4 Chiller Replacement at VAMC Central Western MAMADue Aug 31, 2026
- Torit Dust Extraction System Service and Maintenance for the NMUSNDue Aug 25, 2026
- SLC ARSR HVAC ReplacementUtahDue Aug 25, 2026
- STATION NEAH BAY INSTALL COMPLETE HVAC SYSTEM FOR GYMWashingtonDue Aug 28, 2026
- HVAC REFURBISHMENT CU-9_NHOTICDue Sep 12, 2026