Dredging of Los Angeles River Estuary and Port of Long Beach (Los Angeles County, CA)
- Response deadline
- Aug 12, 2026 Closed
- Date posted
- Jul 14, 2026
- Source
- Open notice
Description
Dredging of Los Angeles River Estuary and Port of Long Beach (Los Angeles County, CA) Construction services consisting of dredging (estimated quantities: 400,000 cubic yards) and disposal of material from the federal navigation channels of San Pedro Bay, specifically the Approach Channel at the Port of Long Beach (POLB) and the Los Angeles River Estuary (LARE) leading to the Queensway Marina. Disposal of the dredged material will be at an EPA approved ocean disposal site (LA-2). POLB design channel depths are ? 76 ft MLLW, and LARE channel depths are as deep as ? 25 ft MLLW. Estimated Construction magnitude is Between $5,000,000 and $10,000,000 NAICS Code 237990 Size Determination Size Determination $45.0M Period of Performance/Calendar Days- *Reference DIV00 Section 00 73 00. BE ADVISED. Files labled with FIO are FOR INFORMATION ONLY. They are not provided as a material part of this acquisition, but are only provided for information only.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)Due Oct 26, 2026
- USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CADue Nov 3, 2026
- BEJ Courtesy Dock Supply and InstallationDue Oct 15, 2026
- Camp Nelson National Cemetery, Ky 833Cm3030 – Correct Fca DeficienciesKentuckyDue Nov 13, 2026
- Fort Bliss National Cemetery, Gravesite Expansion and FCA DeficienciesTexasDue Nov 12, 2026
- USACE SPK DBB Construction - Sacramento River East Levee Contract 5 (SREL C5), Sacramento, CaliforniaDue Oct 23, 2026