SAM.gov47PE5326R0063
Open
DOT HQ Replacement Moveable Bollards
GENERAL SERVICES ADMINISTRATION · District of Columbia
- Response deadline
- Sep 9, 2026 Due in 7 days
- Date posted
- Sep 1, 2026
- Source
- Open notice
Description
The contractor shall provide construction services for design-bid-build projects to replace the hydraulic bollard system outside the East building three (3) bay loading dock to include the 27 hydraulic bollards and associated equipment and controls. The north and south loading dock bays entrances have ten (10) bollards outside the loading dock doors for protection and the center loading dock bay entrance has seven (7) bollards outside the loading dock door. This requirement is being held for current contract holders of the East Coast Corridor IDIQ.
Classifications
Documents (3)
- DOT Bollards Solicitation Amend 260901.pdf.pdf686 KBNot yet available
- DOT HQ Bollards Solicitation Amend 260818.pdf.pdf2.2 MBNot yet available
- 10 - DOT HQ Bollards - RFP IDIQ 260805.zip.zip40.6 MBNot yet available
Contacts
- usman.aslam@gsa.gov2675423933
- jason.taylor@gsa.gov8163499662
Similar contracts
- FRC Ground Level HVAC and Roof ReplacementTexasDue Sep 9, 2026
- 573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMCFloridaDue Sep 9, 2026
- Replacement of Conference Room, and Command Suite WindowsAlaskaDue Sep 9, 2026
- FCI Seagoville Hot Water Generator ReplacementTexasDue Sep 16, 2026
- MAHG 17-1095 Stennis HallMississippiDue Sep 9, 2026
- Z--DENA 332037 Eielson Roof ReplacementDue Oct 1, 2026