SAM.govNS-LEPE_Sources_Sought
Open
DCF NS-LEPE Site Preparation
TREASURY, DEPARTMENT OF THE · District of Columbia
- Response deadline
- Oct 2, 2026 Due in 22 days
- Date posted
- Sep 10, 2026
- Source
- Open notice
Description
This design-build (DB) construction contract is to obtain design and construction services for the removal, disposal, and construction of structural, mechanical, electrical, and architectural elements in BEP’s Main Building, room A-400M, to accommodate the requirements for the future installation of a new NS-LEPE machine. This will be in the Washing DC Facility (DCF).
Classifications
- NAICS238910
Documents (2)
- A400 -NS-LEPE Site Preperation SOW (08.25).pdf.pdf368 KBNot yet available
- Source Sought_NS LEPE DCF.pdf.pdf134 KBNot yet available
Contacts
Similar contracts
- Barren River Lake Repair Drainage Ditch at Tailwater Stilling BasinDue Sep 18, 2026
- Facilities Reduction Program IV (FRP) Solicitation - Official - Amendment 0002Due Sep 24, 2026
- Y--Hickman Wildlife Water Catchment and Pipe FenceNMDue Oct 22, 2026
- Mobile Home DemolitionFloridaDue Sep 11, 2026
- 823-NSP25-003 National Shrine Project at Wood National CemeteryWisconsinDue Sep 11, 2026
- Dismantle of Monarch Milling MachineHawaiiDue Sep 11, 2026