Audio System Modernization
- Response deadline
- Aug 25, 2026 Closed
- Date posted
- Aug 6, 2026
- Source
- Open notice
Description
The Library of Congress (Library) requires contract support to modernize the audio systems for the historic Coolidge Auditorium. The 485-seat venue was constructed as an addition in 1925 for the primary purpose of hosting chamber music concerts. During the mid-1990’s it experienced an upgrade to several components which included adding structed audio amplification, wall panels, floor boxes, audio patch bays, and equipment racks. This analog infrastructure is mostly inoperable, and most of the devices once connected have been decommissioned. To support the wide-range of performances, lectures, and other events that occur in the space – portable audio equipment is loaded in/out for every event. This modernization effort for the audio systems will replace the existing analog infrastructure with digital audio equipment to remove the use of audio equipment housed in road cases, visible cable runs through the house – and provide a modern audio solution that complements the original acoustic quality of the auditorium. The Contractor shall design and implement a new audio system for the Library’s Coolidge Auditorium. Amendment 0001 The purpose of this amendment is to include a site visit and revised the date the questions are due. See attached amendment.
Classifications
Documents (5)
- DownloadBNJ - Coolidge Audio System Modernization.pdf.pdf410 KB
- Download030ADV26R0049 0001.pdf.pdf167 KB
- DownloadAttachment J-1 - Past Performance Questionnaire 7-9-2026 (2 Pages).docx.docx44 KB
- DownloadAttachment J-2 - 030ADV26R0049 - Deliverables Price Schedule 7-16-26 (2 Pages) - Audio Modernization.docx.docx24 KB
- Download030ADV26R0049.pdf.pdf484 KB
Contacts
- moad@loc.gov(202) 707-0400
- olevchuk@loc.gov2027071462
Similar contracts
- 1 FW Network InstallVirginiaDue Sep 28, 2026
- Trickle Charger Installation Notification Warning System SAFBIllinoisDue Sep 28, 2026
- Full Start-Up Commissioning of Data Center Cooling Infrastructure and UPS batteryVirginiaDue Sep 26, 2026
- Triennial Circuit Breaker and Feeder TestingNVDue Oct 2, 2026
- J--Justification For Other Than Full and Open Competition for R10 Laboratory Manche
- Fiber Optic Network RebuildColoradoDue Sep 28, 2026