Civic AI
Civic AI
Procurement intelligence
SAM.gov36C24126Q0644
Open

DG01--NextGEN Infrastructure Upgrades

Response deadline
Aug 28, 2026
Due in 10 days
Date posted
Aug 19, 2026

Description

SITE VISIT Site Visit information: Site visit will be held on Friday, 21 August 2026 at 1:00 PM EST located at the West Haven VAMC. Please contact Peter Sandor directly (peter.sandor@va.gov; (203) 932-5711 Ext. 3152) to schedule attendance at West Haven VAMC. Please note all questions must be submitted to Shawn Lawrence (Shawn.Lawrence@va.gov), prior to Tuesday 25 August 2026 at 3:00 PM EST. No questions will be answered at the site visit. RFIs Will the Government host a site visit or walkthrough prior to the response date? Conduit routing, run lengths, and mounting conditions are the primary cost drivers on this effort, and a brief escorted walkthrough of the 12 locations would allow quoters to price accurately. A site visit has been added to the solicitation. CLINs 0001 and 0003 and Section 3.3 reference "10 locations," but the CLIN quantities are 12 each and the location table in Section 3.3 lists 12 rows. Please confirm the full scope is 12 locations and the CLIN quantities of 12 govern. There are 12 locations in total. Section 3.3 has been updated. Will the Government provide drawings, approximate conduit run lengths, or distances from each IT closet to the corresponding AP location? If not, the site visit in question 1 becomes essential for responsible fixed pricing. A site visit has been added to the solicitation. Please describe ceiling and mounting heights at the AP locations, particularly the sub-ground, basement, and mechanical-type spaces in Buildings 1, 5, and 24. Are there locations that will require powered lifts, and if so, are lifts able to reach those areas (elevator access and floor loading for upper floors such as Building 1, Level 9)? Do not expect ceiling heights of no more than 8 Section 3.7 includes Attachment C, VA Newington Campus Map, while Section 3.3 states all work is at the West Haven VAMC. Please confirm there is no work at the Newington campus under this contract. Newington Map removed. What working hours apply? Specifically, will above-ceiling work in patient care areas be permitted during normal business hours, or should quoters anticipate evening or weekend work? Please also confirm whether ICRA or other infection control permitting will be required for above-ceiling activities. ICRA carts will be required in common spaces. Vendor is required to provide ICRA cart. Can contractor personnel vetting and badging under VA Directive 0710 begin immediately at award, and does the Government anticipate the 30-day period of performance accounting for background investigation processing time? Yes, Vetting and badging will start at time of award. Do to access to IT equipment and spaces the full PIV will need to be acquired prior to initial work performance. Section 5.2 references reconciliation of a "Profit-figure anomaly noted in the Drafter's Note," but no Drafter's Note is included in the solicitation. Please clarify or confirm this reference does not apply. Reference removed. Section 5.2 has been updated. Â

Classifications

Documents (9)

  • 36C24126Q0644_2.docx
    .docx45 KBNot yet available
  • Attachment D - VA information and information system security.pdf
    .pdf219 KBNot yet available
  • Attachment G - Records Management.pdf
    .pdf107 KBNot yet available
  • 36C24126Q0644_1.docx
    .docx18 KBNot yet available
  • Attachment F - VHA Directive 1061.pdf
    .pdf360 KBNot yet available
  • Attachment E - Seasonal Influenza with Vaccines.pdf
    .pdf1.9 MBNot yet available
  • Attachment A - Infrastructure Standard for Telecommunications Spaces v5.pdf
    .pdf5.0 MBNot yet available
  • 36C24126Q0644.docx
    .docx41 KBNot yet available
  • Attachment B - West Haven VAMC Campus Map.pdf
    .pdf323 KBNot yet available

Contacts

Similar contracts

Explore more