Civic AI
Civic AI
Procurement intelligence
SAM.govFA301626R0018
Open

Design-Build - Repair Multi-Service Troop Facility B2263

DEPT OF DEFENSE
Response deadline
Jul 13, 2026
Due in 13 days
Date posted
May 11, 2026

Description

This is a Design-Build project. Design scope shall include design progression submittals from 35% through Issue for Construction (IFC). Design shall cover the work required to renovate the interior of Building 2263 (B2263), correct interior and minor exterior deficiencies from previous renovation efforts, installation of a standby generator, and various site work items. The building is classified as historical, so shall require review and approval of applicable design elements through appropriate historical agencies. The contractor shall provide all plant, labor and materials, design as well as construction, installation, and performance in accordance with (IAW) the Statement of Work (SOW) for B2263. All Attachments and Appendices will be uploaded to SAM.gov.Solicitation POCs: Contract Specialist: Genarie Schafer at genarie.schafer@us.af.mil and Amn Aaron Wilkerson at aaron.wilkerson.4@us.af.mil; Contracting Officer: Javier Tamez at javier.tamez.2@us.af.mil

Classifications

  • NAICS236220
  • PSCZ2AA

Documents (15)

  • Wage Determination TX20260231 - 1.2.2026.pdf
    .pdf33 KB
    Download
  • attachment
    Not yet available
  • Appendix A - Attachment List.pdf
    .pdf21 KB
    Download
  • RFI-Combined_Spec Updates.xlsx
    .xlsx4.7 MB
    Download
  • Construction Cost Estimate Worksheet.xlsx
    .xlsx27 KB
    Download
  • Addendum to RFO 52.212-2, Evaluation.pdf
    .pdf237 KB
    Download
  • Past Performance Information Form.docx
    .docx28 KB
    Download
  • SOW_SpecsIntact.pdf
    .pdf3.4 MB
    Download
  • Material Submittal Register.pdf
    .pdf199 KB
    Download
  • Addendum to RFO 52.212-1, Instructions to Offerors.pdf
    .pdf286 KB
    Download
  • Appendix C - Attachment List.pdf
    .pdf75 KB
    Download
  • Assumptions _ Exceptions.docx
    .docx26 KB
    Download
  • DAF Guidance.pdf
    .pdf148 KB
    Download
  • Appendix B - Attachment List.pdf
    .pdf77 KB
    Download
  • Price Schedule.docx
    .docx27 KB
    Download

Contacts

Explore more