Elevator Modernization Project
- Response deadline
- May 18, 2026 Closed
- Date posted
- May 11, 2026
- Source
- Open notice
Description
5.5.26 Amendment 05 - Changes and Time Extension 4.22.26 Amendment 04 - Adding FAR Clause, Question & Answers and Building Drawings 4.17.26 - Site Visit Sign-in Sheet 4.8.26 Amendment 03 - Adding Technical Specifications 4.6.26 Amendment 02 - Updated project site location 4.6.26 Amendment 01 - Updated Mandatory Site Visit Information Central Office in Washington, DC has identified a need to procure for modernization of three (3) passenger elevators and one (1) freight elevator. Also as a requirement, the elevator motor room must have its own separate entrance. Therefore the contractor will close off the current entrance from the engineer's room and bulid an outsidedoor with stairs to comply with building codes.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- 613-22-700 | EHRM Infrastructure Upgrades Construction | Martinsburg, WVWest VirginiaDue Nov 6, 2026
- 460-26-004 | Wilmington VAMC Roof Replacement | NCO 4 Construction EastDelawareDue Nov 4, 2026
- P084 Next Generation Torpedo Integration Lab, Naval Station Newport, Newport RiRhode IslandDue Nov 10, 2026
- Chino Emergency RepairsArizonaDue Nov 9, 2026
- RFQ W912QR279A001 Amendment 0001: Construction Manager at Risk (CMAR) Construction of Equipment Concentration Site, Fort Carson, ColoradoDue Oct 28, 2026
- MCI East Barracks Industrialized Construction Projects for Barracks via Other Transaction Authority (10 USC 2808a)Due Oct 29, 2026