Elevator Modernization
- Response deadline
- Jul 21, 2026 Closed
- Date posted
- Jun 10, 2026
- Source
- Open notice
Description
The Contractor shall develop bridging documents, consisting of conceptual design, technical specifications, and performance criteria for the complete repair of seventeen electric elevators (12 passenger and 5 freight as identified in the 2024 Elevator Assessment) replacing all components that are obsolete and/or have reached end-of-life, including MEP systems upgrades, ACM abatement, PCBs removal, structural and architectural alterations to bring the existing machine rooms and hoistways up to code. New elevator controllers shall be integrated with BEP’s existing Supervisory Control and Data Acquisition (SCADA) system. The bridging documents should provide enough detail to allow successful solicitation of a design-build construction contract addressing complete alteration of the elevators. The Contractor shall ensure compliance with all federal, state, and local regulations, minimize disruption to building operations during installation and achieve targeted energy savings and sustainability goals.
Classifications
Documents (10)
- Download2031ZA26Q00100 Elevator Modernization Solicitation.pdf.pdf366 KB
- DownloadAttachment 2c - 75B-07.0-06 EHS Requirements for Large Equipment Purchases.pdf.pdf169 KB
- DownloadAttachment 4 - DCF Wage Determination.pdf.pdf44 KB
- DownloadAttachment 3 - Pricing Schedule.xlsx.xlsx11 KB
- DownloadAttachment 2f - 2024 Elevator Assessment - REDACTED_Redacted.pdf.pdf25.3 MB
- DownloadAttachments 2b - 75B-07.0-05 EHS Requirements for Purchased Materials.pdf.pdf196 KB
- DownloadAttachment 1 - Site Visit Information.pdf.pdf129 KB
- DownloadAttachments 2a - 75D-07.0-04 EHS Contractor Requirements.pdf.pdf212 KB
- DownloadAttachment 2 - Elevator Modernization - SOW.pdf.pdf194 KB
- DownloadAttachment 2d - 75D-07.0-07 Restricted Materials at DCF.pdf.pdf232 KB
Contacts
Similar contracts
- Indefinite Delivery/Indefinite Quantity Multiple Award Contract for Multidiscipline Architect-Engineer Services in Support of Construction Projects Located Primarily in the Norfolk District Area of Responsibility (Aor)Due Nov 4, 2026
- B Department Operations SupportVirginiaDue Jan 1, 2027
- 2027 US and Uk Weapon Control System Spares and Special Support EquipmentMassachusettsDue Oct 20, 2026
- Engineering anomaly support to the existing Geostationary Operational Environmental Satellite (GOES)-NOP series spacecraft imager and sounder instrumentsIndiana
- Engineering anomaly support to the existing Geostationary Operational Environmental Satellite (GOES)-NOP series spacecraft busCalifornia
- Radiac and Radcon Program Professional Support ServicesDue Oct 19, 2026