Elevator Modernization
- Response deadline
- Jul 21, 2026 Due in 4 days
- Date posted
- Jun 18, 2026
- Source
- Open notice
Description
18 June 2026 - Issue amendment 0001 to update Attachment 1 - Site Visit Information. The Contractor shall develop bridging documents, consisting of conceptual design, technical specifications, and performance criteria for the complete repair of seventeen electric elevators (12 passenger and 5 freight as identified in the 2024 Elevator Assessment) replacing all components that are obsolete and/or have reached end-of-life, including MEP systems upgrades, ACM abatement, PCBs removal, structural and architectural alterations to bring the existing machine rooms and hoistways up to code. New elevator controllers shall be integrated with BEP’s existing Supervisory Control and Data Acquisition (SCADA) system. The bridging documents should provide enough detail to allow successful solicitation of a design-build construction contract addressing complete alteration of the elevators. The Contractor shall ensure compliance with all federal, state, and local regulations, minimize disruption to building operations during installation and achieve targeted energy savings and sustainability goals.
Classifications
Documents (12)
- Download2031ZA26Q00100 Elevator Modernization Solicitation.pdf.pdf366 KB
- DownloadAttachment 2c - 75B-07.0-06 EHS Requirements for Large Equipment Purchases.pdf.pdf169 KB
- DownloadAttachment 4 - DCF Wage Determination.pdf.pdf44 KB
- DownloadAttachment 3 - Pricing Schedule.xlsx.xlsx11 KB
- DownloadAttachment 2f - 2024 Elevator Assessment - REDACTED_Redacted.pdf.pdf25.3 MB
- DownloadAttachments 2b - 75B-07.0-05 EHS Requirements for Purchased Materials.pdf.pdf196 KB
- DownloadAttachment 1 - Site Visit Information.pdf.pdf129 KB
- DownloadAttachments 2a - 75D-07.0-04 EHS Contractor Requirements.pdf.pdf212 KB
- Download2031ZA26Q00100 0001.pdf.pdf245 KB
- DownloadAttachment 2 - Elevator Modernization - SOW.pdf.pdf194 KB
- DownloadAttachment 2d - 75D-07.0-07 Restricted Materials at DCF.pdf.pdf232 KB
- DownloadAttachment 1 - Site Visit Information 18 June 2026.pdf.pdf130 KB
Contacts
- Marico Sellers