Description
16 July 2026 - Amendment 0003 to extend proposal due date. 6 July 2026 - Issue amendment 0002 to 1. Post Responses to questions. 2. Update Attachment 1 - SOW. 3. Update Section L. 4. Attach document 2e. 5. Attach Site Visit Sign-in sheet. 18 June 2026 - Issue amendment 0001 to update Attachment 1 - Site Visit Information. The Contractor shall develop bridging documents, consisting of conceptual design, technical specifications, and performance criteria for the complete repair of seventeen electric elevators (12 passenger and 5 freight as identified in the 2024 Elevator Assessment) replacing all components that are obsolete and/or have reached end-of-life, including MEP systems upgrades, ACM abatement, PCBs removal, structural and architectural alterations to bring the existing machine rooms and hoistways up to code. New elevator controllers shall be integrated with BEP’s existing Supervisory Control and Data Acquisition (SCADA) system. The bridging documents should provide enough detail to allow successful solicitation of a design-build construction contract addressing complete alteration of the elevators. The Contractor shall ensure compliance with all federal, state, and local regulations, minimize disruption to building operations during installation and achieve targeted energy savings and sustainability goals.
Classifications
Documents (18)
- 2031ZA26Q00100 Elevator Modernization Solicitation.pdf.pdf366 KBNot yet available
- Attachment 2c - 75B-07.0-06 EHS Requirements for Large Equipment Purchases.pdf.pdf169 KBNot yet available
- Attachment 4 - DCF Wage Determination.pdf.pdf44 KBNot yet available
- 2031ZA26Q00100 0003.pdf.pdf328 KBNot yet available
- Attachment 3 - Pricing Schedule.xlsx.xlsx11 KBNot yet available
- Attachment 2f - 2024 Elevator Assessment - REDACTED_Redacted.pdf.pdf25.3 MBNot yet available
- Elevator Modernization - Request for Clarifications-Questions-Answers - Responses.pdf.pdf126 KBNot yet available
- Attachment 1 - Elevator Modernization - Revision 6 Jul 2026.pdf.pdf194 KBNot yet available
- Attachments 2b - 75B-07.0-05 EHS Requirements for Purchased Materials.pdf.pdf196 KBNot yet available
- 2031ZA26Q00100 0002 - 6 July 2026.pdf.pdf253 KBNot yet available
- Attachment 1 - Site Visit Information.pdf.pdf129 KBNot yet available
- Attachments 2a - 75D-07.0-04 EHS Contractor Requirements.pdf.pdf212 KBNot yet available
- 2031ZA26Q00100 0001.pdf.pdf245 KBNot yet available
- Attachment 2e - DCF-1001538 Annex and Main Building Elevator Schedule.pdf.pdf254 KBNot yet available
- Attachment 2 - Elevator Modernization - SOW.pdf.pdf194 KBNot yet available
- Attachment 2d - 75D-07.0-07 Restricted Materials at DCF.pdf.pdf232 KBNot yet available
- Attachment 1 - Site Visit Information 18 June 2026.pdf.pdf130 KBNot yet available
- Elevator Modernization Pre-Bid Site Walk - Sign in Sheet 6-24-2026.pdf.pdf90 KBNot yet available
Contacts
- Marico Sellers