SAM.gov47PE5326R0033
Open
DOT HQ Moveable Bollards
- Response deadline
- Jul 29, 2026 Closed
- Date posted
- Jul 27, 2026
- Source
- Open notice
Description
Provide construction services for design-bid-build project to replace the hydraulic bollard system outside the East building three (3) bay loading dock to include the 27 hydraulic bollards and associated equipment and controls. The north and south loading dock bays entrances has ten (10) bollards outside the loading dock doors for protection and the center loading dock bay entrance has seven (7) bollards outside the loading dock door. This requirement is being held for holders of the GC/DB Zone A IDIQ.
Classifications
Documents (6)
- 47PE5326R0033 DOT HQ Bollards Solicitation 260604.zip.zip2.1 MBNot yet available
- DOT HQ Bollards Amend 3 Solicitation 260717.pdf.pdf735 KBNot yet available
- DOT HQ Bollards Amend 4 Solicitation 260727.pdf.pdf1.8 MBNot yet available
- DOT HQ Bollards Amend 2 Solicitation 260625.zip.zip3.9 MBNot yet available
- DOT HQ Bollards Solicitation Amend 47PE5326R0033_0001.pdf.pdf879 KBNot yet available
- 47PE5326R0033 DOT HQ Bollards Agreement 260604.zip.zip39.1 MBNot yet available
Contacts
- usman.aslam@gsa.gov2675423933
- jason.taylor@gsa.gov8163499662
Similar contracts
- 2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221OklahomaDue Oct 30, 2026
- Sources Sought / Market Intelligence: Multi-Projects for Army Reserve Program – Construction Management at Risk (CM@Risk) utilizing Other Transaction Authority (OTA)Due Oct 5, 2026
- PLA Survey for Human Performance Wig Lab at WPAFBOhioDue Oct 7, 2026
- HST Roof Safety Construction ProjectDistrict of ColumbiaDue Oct 19, 2026
- Construct US Space Force Integration Facility, F/10852 Wpafb, OhioOhioDue Oct 6, 2026
- Fort Lee Vehicle Recovery RangeVirginiaDue Oct 13, 2026