Civic AI
Civic AI
Procurement intelligence
SAM.govAOCACB26R0033
Open

Annual Health & Safety Audit

ARCHITECT OF THE CAPITOL · DC
Response deadline
Jul 17, 2026
Due in 17 days
Date posted
Jun 5, 2026

Description

The objective of the Audit is to inform US Capitol Power Plant (CPP) management regarding the current conditions and operational practices within the utility tunnels in terms of safety and health compliance to local, state, and federal regulations. The Audit shall identify and document all current areas of non-compliance. Findings shall address condition changes as related to past reports, new deterioration or safety concerns, and the probable cause. The report shall also identify if there is a potential for tunnel or pipe failure or other imminent concerns. The report shall also address noted changes in the condition of the tunnel as it relates to past reports or audits, including but not limited to the acceleration of concrete spalling de-laminations, cracks, damages to pipe insulation, and conditions of electrical conduits. The Audit Report shall contain digital photograph(s). Health and Safety Audits shall be completed under the direction of a Certified Industrial Hygienist and/or Safety Specialist, and Mechanical and Electrical Engineer(s).

Classifications

  • NAICS541690
  • PSCH947

Documents (11)

  • AOCACB26R0033.pdf
    .pdf1.2 MBNot yet available
  • Attach 7 - Sample Certificate of Insurance (COI) 2022.pdf
    .pdf3.0 MBNot yet available
  • Attach 10 - Past Performance Questionnaire.pdf
    .pdf133 KBNot yet available
  • Attach 4 - CUI Order 42-4 Security of Controlled Unclassified Information.pdf
    .pdf1.1 MBNot yet available
  • Attach 6 - USCP ID Request.pdf
    .pdf912 KBNot yet available
  • Attach 1 - CPP UDS Annual HS Audits 2026-2030 SOW Updated.pdf
    .pdf279 KBNot yet available
  • Attach 2 - Wage Determination 5.18.26.pdf
    .pdf39 KBNot yet available
  • Attach 5 - USCP Request for Criminal History.pdf
    .pdf264 KBNot yet available
  • Attach 3 - AOC Order 37-1 Preservation Policy and Standards 2025.pdf
    .pdf423 KBNot yet available
  • Attach 9 - M - Evaluation Factors for Award.pdf
    .pdf126 KBNot yet available
  • Attach 8 - Section L - Instructions to Offeror.pdf
    .pdf191 KBNot yet available

Contacts

Explore more