Civic AI
Civic AI
Procurement intelligence
ct_source26-59
Open

Industrial Park Water Storage Tank TTHM Removal System and Appurtenances

Response deadline
Jun 24, 2026
Closed
Date posted
May 13, 2026

Description

The project consists of the rehabilitation of the existing Industrial Park water storage tank including recoating of the tank’s existing exterior and interior surfaces, the installation of a new total trihalomethane (TTHM) removal system and appurtenant work. The existing Industrial Park Water Storage tank is a 0.670 MG welded steel tank approximately 72 feet in height with a diameter of approximately 40 feet located in Norwich, Connecticut. Additional work will include the replacement of the cathodic protection system components, a new combination free chlorine/pH analyzer and above-grade cabinet, a new above-grade 12-foot x 10-foot structure, a new 30 KW diesel driven standby generator and related site work.

Classifications

  • NAICS72000000

Documents

No documents posted for this opportunity.

Explore more