Civic AI
Civic AI
Procurement intelligence
OpenGov / IonwaveB027-08
Open

B027-08 Edison Middle School Floor Replacement

City of Meriden — BOE · CT
Response deadline
Jul 15, 2026
Closed
Date posted
Jun 24, 2026

Description

The City of Meriden is seeking the services of a contractor to remove and replace approximately 4,088 sq ft of VCT flooring in SOAR hallway, gym, teacher offices, and connected side halls (as highlighted on attached drawings) at Edison Middle School. The flooring contractor shall, rip out, remove, and properly dispose of the existing flooring prior to prepping and installing the new flooring. The flooring contractor shall also be responsible for providing dumpsters for the disposal of the flooring material and maintain them through the duration of the project. The contractor is to install Mapie Planiseal, Sika MB, Ardex MC Rapid 20-year warranted epoxy moisture mitigation system or equivalent before installing new VCT to match existing patterns. Floor grinding will be performed with a HEPA vacuum attached, but it is not 100% dust free. Precautions should be made by others to move, cover, and/or protect delicate surrounding surfaces. Furniture moving and VCT waxing to be done by others. Work could be completed during the summer hours of 6:00 am to 2:30 pm daily.

Documents

No documents posted for this opportunity.

Explore more