Coso Microearthquake Network Modernization Study
- Response deadline
- Jul 31, 2026 Closed
- Date posted
- Jul 21, 2026
- Source
- Open notice
Description
This requirement is to conduct a comprehensive engineering study of the current microearthquake (MEQ) network. The contractor shall perform a complete site survey and analysis of the existing network, which includes approximately 15 permanent seismic monitoring stations, 1 temporary seismic monitoring station, the Joshua Ridge repeater site, and the central data acquisition and processing site at the Navy Geothermal Program Office (GPO) office building at NAWSCL. The primary deliverable is a final Network Upgrade Plan and Cost Analysis Report. This report must provide a detailed plan, including a Plan of Action and Milestones (POAM), and a corresponding Rough Order of Magnitude (ROM) cost estimate for the full modernization of the network hardware, software, and communications infrastructure. The analysis must be objective, impartial, and vendor-agnostic.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- SR Power Supplies Rack Detailed Design for ALS-UCaliforniaDue Oct 20, 2026
- Solicitation Number 393585 “Warm Facility Hazard Category Determination”WashingtonDue Nov 3, 2026
- MIW and SMCM Engineering Support - SEAPORTDue Nov 10, 2026
- Orbital Safety Analysis (OSA) Support - JOFOCMaryland
- USAF Special Operations Forces Technical Data Management, Development, and Provisioning ProjectGeorgiaDue Oct 30, 2026
- 620-27-202 Mission Critical Roofs B5Due Oct 14, 2026