Construct Air Traffic Control (ATC) Tower
- Response deadline
- Aug 17, 2026 Due in 4 days
- Date posted
- Aug 13, 2026
- Source
- Open notice
Description
**** August 12, 2026 Modification P00001 The Following actions amended: a. DFARS Clause 252.204-7025 Notice of Cybersecurity Maturity Model Certification Level Requirements has been deleted in its entirety. b. Section II, Specification 00 21 16, Evaluation of Performance Confidence, Relevancy was amended: Projects valued at $20,000,000 (present day value) or more. or greater (present day value utilizing a yearly 3.5% escalation factor) for each project.c. Appendix A Performance Assessment has been added in its entirety. TITLE: CONSTRUCT AIR TRAFFIC CONTROL TOWER (ATC) FT RILEY, KANSAS Solicitation Number: W921DQ26RA061 The U.S. Army Corps of Engineers, Kansas City District intends to solicit and award a Design-Bid-Build (DBB) contract for the construction of a new Air Traffic Control (ATC) Tower and demolition of the existing tower on Ft Riley, KS. THIS IS A REQUEST FOR PROPOSAL (RFP) WHICH WILL RESULT IN THE AWARD OF A SINGLE FIRM-FIXED-PRICE (FFP) DESIGN BID-BUILD CONTRACT.THE PROJECT IS FULL AND OPEN (UNRESTRICTED) FOR BOTH LARGE AND SMALL BUSINESSES.THE NORTH AMERICAN INDUSTRY CLASSIFICATION (NAICS) CODE IS 236220 - COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION. THIS AWARD IS SUBJECT TO THE AVAILABILITY OF FUNDS.THE MAGNITUDE OF THIS PROJECT IS BETWEEN $20,000,000.00 AND $40,000,000.00.THE SMALL BUSINESS SIZE STANDARD IS $45,000,000.00.A SITE VISIT PLANNED FOR JULY 29, 2026. DETAILS CONTAINED WITHIN THIS SOLICITATION. The Government proposes to issue a single firm fixed price type contract for this project. The scope of work for this Design-Bid-Build project is to construct a 10-story Air Traffic Control Tower consisting of control Cab, offices, conference room, breakroom, electrical and mechanical rooms, radar simulator room and associated utility and site work. The project includes, but is not limited to, construction of concrete foundation systems, steel framing, masonry walls, metal roof, fire detection and suppression systems, HVAC, electrical systems, telecommunication systems, backup electrical generation, elevator, utilities, sidewalks, access drive, grading and site improvements, and other required features of work. Demolition of the existing Air Traffic Control Tower and associated structures is also required. ACQUISITION STRATEGY The Government anticipates a single, firm fixed price type contract for this project. The selection will use a single phase Request for Proposal (RFP) using Best Value that is determined to be the most beneficial to the Government. At this time, the Goverment does not anticipate the need for a Project Labor Agreement (PLA)
Classifications
Documents (3)
- Projnet Access Instructions.pdf.pdf59 KBNot yet available
- I.01.11 Site Visit Sign in Sheet 20260729.pdf.pdf71 KBNot yet available
- attachmentNot yet available
Contacts
- dale.e.coleman@usace.army.mil8163893500
- stephanie.r.kretzer@usace.army.mil(816) 389-2355
Similar contracts
- EXTERIOR UPGRADE, FRANKFURTDue Aug 31, 2026
- Fort Benning Job Order Contract (JOC)GeorgiaDue Aug 26, 2026
- DB VEHICLE MAINTENANCE FACILITY, BASA AIR BASE, PHILIPPINES. Due Sep 14, 2026
- (SOL. Amendment) MATOC WP_W90VN726RA024_Repair Roof Contingency SQ Ops, B2548Due Aug 21, 2026
- 657-26-602 Create Observation Unit JCMissouriDue Sep 1, 2026
- AMENDMENT 0001 - 19KU2026Q0012: Chancery Annex Restroom, Lactation RM &Locker RMs RenovationḨawallīDue Aug 20, 2026