USCG Cutter Eagle New Dredging for Berthing at New London City Pier
- Response deadline
- Oct 15, 2026 Due in 34 days
- Date posted
- Sep 11, 2026
- Source
- Open notice
Description
Eagle Pier New Dredging (FY26) at New London’s City Pier, CT (NEW LONDON COUNTY), PSN #24014900. Contractor shall provide all personnel, equipment, materials, and all other items and services required to perform dredging of a new area immediately south of CGC EAGLE’s berth at New London’s City Pier. The intent is to deepen the area to allow tugboats to assist the cutter for mooring/unmooring at all tide levels. Requirements of the design specify dredging to a depth of -17.0’ at Mean Lower Low Water (MLLW) +2.0’ over dredging allowance. This equates to approximately 3,700 cubic yards (CY) of dredge spoils to remove to an upland disposal site. Offshore disposal is not permitted due to environmental sample analysis of the dredge area. There is an environmental time of year restriction in Connecticut that only permits dredging activities between October 1st and March 1st. SPECIAL NOTES: The contractor shall conduct dredging operations so that navigation through the channel is possible at all times. The scope of work also includes removals of approximately 50 piles that remain below the waterline. Any piles that cannot be fully removed are to be cut at -21.0’ MLLW. Dredge quantity of 3,700 CY. This estimate is based on an average of the past annual dredging and surveys. The Contractor shall provide a cost for dredging per cubic yard. That per cubic yard cost will be used for any necessary contract cost adjustment resulting from dredging more or less than the estimated 3,700 cubic yards, within the limits of dredge. Contractor will be compensated for actual quantity of dredge material removed and disposed, within the limits of dredge, as shown on the plan sheets. Dredge disposal site location is to be determined by conditions of treated/non-treated piles for Base bid item and Option Bid item. The estimated value of the procurement is between $1,000,000 and $5,000,000. A 20% bid guarantee is required. Performance and Payment bonds will be required. The performance period is estimated to be 300 calendar days from issuance of Notice to Proceed. This acquisition is issued pursuant to FAR Part 14 Sealed Bidding and is 100% Set-Aside for Small Business concerns. All relevant solicitation documents, including specifications and drawings may be accessed for download beginning on the date of issue of the IFB at the following site: https://www.sam.gov. Vendors MUST be registered in the System for Award Management database through https://www.sam.gov in order to receive a federal government contract. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.
Classifications
Documents (5)
- P23946211_SPEC_15JUL26.pdf.pdf20.2 MBNot yet available
- SF24 - Bid Bond form.pdf.pdf703 KBNot yet available
- WD_CT20260006 18May26.pdf.pdf64 KBNot yet available
- P23946211_DWG.pdf.pdf6.2 MBNot yet available
- IFB 70Z0G126BSLISSW02 - EAGLE NEW DREDGING.pdf.pdf1.0 MBNot yet available
Contacts
Similar contracts
- USCG Cutter Eagle New Dredging for Berthing at New London City PierCTDue Sep 10, 2026
- FY26 anticipated levee work requirements within the Mississippi Valley Division (MVD) in the Memphis (W912EQ), Vicksburg (W912EE), and New Orleans (W912P8) DistrictsDue Sep 30, 2026
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 8-2025 (OM25008)LADue Mar 23, 2027
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 8-2025 (OM25008)LADue Feb 28, 2027
- USCG Sector Field Office Southwest Harbor - Major Maintenance and Repair Galley and HousingMaineDue Sep 17, 2026
- USCG Sector Field Office Southwest Harbor - Major Maintenance and Repair Galley and HousingMaineDue Sep 17, 2026