In-Kind replacement Consolidated Club door
- Response deadline
- Sep 1, 2026 Due in 4 days
- Date posted
- Aug 27, 2026
- Source
- Open notice
Description
The United States Coast Guard Academy has a requirement for the replacement in kind of an existing folding accordion-style door at the Consolidated Club, located at 15 Mohegan Drive, New London, Connecticut. The contractor shall provide all labor, materials, tools, equipment, supervision, transportation, and incidentals necessary to remove and properly dispose of the existing accordion door assembly, including tracks, hardware, and associated mounting components, and furnish and install a new hardwood cherry veneer accordion-style partition door. The replacement door shall include matching side attachments, a center-opening configuration, all required tracks, rollers, hinges, guides, latches, hardware, and fasteners, and shall fit the existing opening of approximately 6 feet 10 inches high by 15 feet wide without modifying the existing structure or opening. The contractor shall verify field conditions prior to fabrication or installation and leave the work area clean upon completion.
Classifications
Documents (3)
- Combined Synopsis Solicitation_C Club Door.docx.docx52 KBNot yet available
- SOW - Con CLub door.docx.docx1.1 MBNot yet available
- Attachment A.xlsx.xlsx18 KBNot yet available
Contacts
- kayla.l.rex@uscg.mil2068201998
- jason.m.askew@uscg.mil5716072956
Similar contracts
- Z--WEAR PMIS 344184B & BELA 352775A WINDOWSDue Sep 9, 2026
- Deck and Gate Replacements, Camp Edwards, Joint Base Cape Cod, Buzzards Bay, MADue Sep 1, 2026
- Window Awnings with InstallationCaliforniaDue Sep 9, 2026
- B44 Breakroom RemodelKansasDue Aug 27, 2026
- Deck and Gate Replacements, Camp Edwards, Joint Base Cape Cod, Buzzards Bay, MADue Aug 27, 2026
- Z--WEAR PMIS 344184B & BELA 352775A WINDOWSDue Sep 9, 2026