NextGEN Infrastructure Upgrades
- Response deadline
- Sep 3, 2026 Due in 3 days
- Date posted
- Aug 31, 2026
- Source
- Open notice
Description
NextGEN Infrastructure Upgrades - RFIs .Does attendance at the 21 August site visit condition eligibility to quote by the 28 August 2026, 5:00 PM Eastern closing date? No, attendance is not mandatory. If attendance is required, would the Government consider either a second walkthrough before the closing date, or an escorted walkthrough for a single authorized subcontractor representative at a time convenient to Engineering? Attendance was not mandatory, additionally another site visit will not be granted. Is there any information identifying the approximate conduit routes and run lengths, telecommunications-room locations, access-point locations, ceiling or mounting heights, and site-access conditions? We reviewed the solicitation attachments and located the West Haven campus map and the general VA telecommunications infrastructure standard; however, we did not find project-specific drawings or photographs of the work areas. All APs Diagram attached. No additional drawings will be provided.
Classifications
Documents (11)
- 36C24126Q0644_2.docx.docx45 KBNot yet available
- Attachment D - VA information and information system security.pdf.pdf219 KBNot yet available
- Attachment G - Records Management.pdf.pdf107 KBNot yet available
- 36C24126Q0644_1.docx.docx18 KBNot yet available
- Attachment F - VHA Directive 1061.pdf.pdf360 KBNot yet available
- Attachment E - Seasonal Influenza with Vaccines.pdf.pdf1.9 MBNot yet available
- Attachment A - Infrastructure Standard for Telecommunications Spaces v5.pdf.pdf5.0 MBNot yet available
- 36C24126Q0644.docx.docx41 KBNot yet available
- All APs.pdf.pdf1.8 MBNot yet available
- 36C24126Q0644_3.docx.docx17 KBNot yet available
- Attachment B - West Haven VAMC Campus Map.pdf.pdf323 KBNot yet available
Contacts
- Contract Specialistshawn.lawrence@va.gov203-932-5711
Similar contracts
- Replace 32 Exhaust Fans, Poplarville, MississippiMississippiDue Sep 9, 2026
- Supply and Install Greenhouse Evaporative Cooling System, Stoneville, MississippiMississippiDue Sep 15, 2026
- FY26 NRM - Install Analog Phone Line to Building 6 - 610A4-26-510IndianaDue Sep 10, 2026
- Replacement of the Outdated Fire Alarm System, Curtius Annex, U.S. Embassy Berlin, GermanyBerlinDue Sep 21, 2026
- N--Ak-Kenai Nwr-Audiovisual RepairDue Sep 21, 2026
- H--Cuga- Upgrade Wr Campground ElectricalDue Sep 21, 2026