Z--BLM-CO TRFO BASIN WELL AND WATER SYSTEM
- Response deadline
- Sep 9, 2026 Due in 11 days
- Date posted
- Aug 28, 2026
- Source
- Open notice
Description
BLM-CO TRFO BASIN WELL AND WATER SYSTEM IMPROVEMENTS This solicitation is being amended to reopened to change the set aside to 100% Total Small Business due to original set-aside resulting in no responses, post it to open market (SAM.gov), update terms and conditions, and adding attachments. All questions are due by September 2, 2026 1200 MD. This is a solicitation announcement for well improvements of a well house located at the Bureau of Land Management TRFO Basin Well, Montrose County, Colorado near Naturita, CO. 1.1 PROJECT DESCRIPTION Contractor shall provide a turnkey solar powered, well water system that automatically provides and maintains water to a wildlife drinking tank with minimal human input except winterization and annual maintenance. System shall be designed to have a solar pumping system at an existing water well. Provide water to an elevated buried storage tank. The buried storage tank will gravity feed the drinking tank. An additional tee and valve shall be provided for a future upgrade for a stockwater tank. System shall be designed to be freeze proof and operational in the winter to the frost free hydrant at the drinking tank. 1.2 LOCATION Latitude: 38.06529167° N Longitude: -108.63154723° W From Naturita, CO. Travel south on CO-141 for approximately 12 miles. Turn right (west) on County Road U29. Travel approximately 5 miles. The project is on the left (south). 1.3 WORK SCHEDULE Work shall be completed within 360 days of the Notice to Proceed. Contractor shall complete all work within 360 days of starting work. Work is not allowed on Federal holidays. Work shall occur Monday through Friday. Contract time will be paused, upon request, when snow or snowmelt prevents work at the project site. Period of Performance: Work shall be completed within 360 days of the Notice to Proceed. Basic Contracting Requirements: 1. Active Registration - www.sam.gov - check it now please. Free assistance is available at your local APEX Accelerators - https://www.apexaccelerators.us/#/ 2. Invoicing and Payment - www.ipp.gov - 14 day prompt pay with progress payments 3. FAR Part 12- Acquisition of Commercial Products and Commercial Services 4. FAR Part 36 - Construction Provisions and Clauses 5. Davis Bacon Act Wages for Montrose County, CO 6. Total Small Business Set-Aside for NAICS 237110 -Water and Sewer Line and Related Structures Construction $45 7. Bid, Performance and Payment Bonding maybe required 8. Type of Contract - Firm Fixed Price 9. Basis of Award -LPTA see Sections L and M Primary POC: Contracting Specialist Courtni Strickland cstrickland@ios.doi.gov
Classifications
Documents (6)
- A04_BID_SCHEDULE_BASIN_WELL_IMP.pdf.pdf112 KBNot yet available
- Sol_140L1726R0005_Amd_0001.pdf.pdf559 KBNot yet available
- Sol_140L1726R0005.pdf.pdf406 KBNot yet available
- B08_UPDATED_140L1726R0005__TERMS_AND_CONDITIONS_v_08_27_2026_0001.pdf.pdf311 KBNot yet available
- A05_PWS_BASIN_WELL_IMP.pdf.pdf7.3 MBNot yet available
- B03_WD__CO20260003.pdf.pdf40 KBNot yet available
Contacts
Similar contracts
- Repair Water Tower B738TexasDue Sep 2, 2026
- N1 Brake RingDue Sep 11, 2026
- Forest Wide Well DecomArizonaDue Sep 23, 2026
- Z--New Vertical Micro Screen/Strainer Screw CompactorsDue Sep 10, 2026
- Town of Cairo - Water System Improvement ProjectDue Sep 8, 2026
- Repair Water Tanks 1511 & 1512MontanaDue Sep 29, 2026