Solicitation- WT 18058173 Airfield and Weather Flight Carpet Replacement
- Response deadline
- Aug 26, 2026 Due in 9 days
- Date posted
- Aug 17, 2026
- Source
- Open notice
Description
This project entails the removal and replacement of flooring approximately 4,370 square foot of carpet on the first floor of Building 122, Peterson Space Force Base (PSFB). The contractor will coordinate with the 21st Civil Engineering Squadron (21 CES) to conduct bio-environmental screening for hazardous materials beneath the existing flooring. Once cleared, the contractor will remove the old carpet and rubber cove base, managing daily site clean-up and off-base debris disposal, as on-site equipment storage is strictly prohibited. To prepare the space, the contractor will relocate standard furniture --coordinating with the Government to ensure all IT cables, power cords, and personal items are removed beforehand. The installation phase requires laying new, commercial-grade modular carpet tiles or planks directly over the existing vinyl flooring using low-VOC adhesives. The contractor will also install a new vinyl cove base, trim door bottoms for proper clearance, and perform any necessary wall spackling and painting to repair damage caused during the removal of the old baseboards. The project will conclude with the repositioning of all furniture and a final Quality Assurance acceptance inspection conducted by 21 CES Operations Flight personnel. Please see attached Combo Solicitation and attachments for detailed information required.
Classifications
Documents (4)
- Attachment 3 - Manufacturer POC List.pdf.pdf32 KBNot yet available
- Attachment 1 - Building 122 Carpet Replacement PWS.pdf.pdf281 KBNot yet available
- Attachment 2 - BLDG 122 Map and Estimated Carpet Sq Footage.pdf.pdf119 KBNot yet available
- Combo Solicitation.pdf.pdf2.0 MBNot yet available
Contacts
Similar contracts
- Mondeaux Floor RefinishingWisconsinDue Aug 26, 2026
- SOLICITATION: Flooring Material and Installation BPA (Amendment 1)South DakotaDue Aug 21, 2026
- INTERIOR REPAIRS SALLYPORT 1ST AND 3RD FLOORSNew YorkDue Aug 31, 2026
- JBER Chapel Flooring ReplacementAlaskaDue Aug 25, 2026
- USUN ReflooringRoma
- SLD 30/SE, B7015, Carpet Removal/InstallationCaliforniaDue Sep 1, 2026