NIST Boulder Solar Lighting Upper Site Replacement
- Response deadline
- Aug 18, 2026 Due in 7 days
- Date posted
- Aug 11, 2026
- Source
- Open notice
Description
11 AUG 2026 - Published AMD 0004 RFI and extend due date 6 AUG 2026 - Published AMD 0003 Minor changes to Instructions and Evaluation. 4 AUG 2026 - Published AMD 0002 inc rfis and minor changes. Added Site visit attendance sheet The National Institute of Standards and Technology (NIST) Boulder Campus seeks a qualified contractor to replace aging solar-powered exterior pole luminaires with new hard-wired LED pole luminaires throughout selected areas of the campus. Work includes demolition and removal of existing solar lighting systems, design and installation of new pole bases and luminaires, photometric analysis, structural pole base design stamped by a licensed Colorado Professional Engineer, and installation of new electrical circuits originating from nearby building panelboards. Construction activities include trenching, backfilling, restoration of landscaped and hardscaped areas, equipment labeling, and coordination of electrical shutdowns. All work must comply with NEC, NIST site standards, and applicable safety and security requirements. Important Dates: List of Individuals Attending Site Visit Due: Friday, July 17, 2026 to Lauren.Lopez@nist.gov cc: Shawn.Borisow@nist.gov Site Visit: Tuesday, July 21, 2026 @ 1:00pm at Building 25 Questions Due: July 30, 2026 @ 5:00pm to Lauren.Lopez@nist.gov cc: Shawn.Borisow@nist.gov Proposals Due: August 13, 2026 @ 5:00pm to Lauren.Lopez@nist.gov cc: Shawn.Borisow@nist.gov
Classifications
Documents (18)
- Download07 B25 AsBuilts.pdf.pdf971 KB
- Download13 NIST Elec Site Standards.pdf.pdf170 KB
- Download09 HighSpeedSwith Elec AsBuilts.pdf.pdf4.7 MB
- Download11 Existing Utility Plan and Testholes.pdf.pdf9.6 MB
- Download1333ND26RNB190033 0002 Inc RFIs.pdf.pdf1.3 MB
- Download1333ND26RNB190033.pdf.pdf3.1 MB
- Download06 B22 AsBuilts.pdf.pdf147 KB
- Download08 B51 Elec AsBuilts.pdf.pdf1.4 MB
- DownloadSolar Ltg Upper Site Replacement - Additional Supplemental Info.pdf.pdf1.5 MB
- Download12 Front Range Areas 1 - 4 Existing Utility Plan and Testholes.pdf.pdf9.6 MB
- Download10 Laydown Yard Elec 1Line.pdf.pdf818 KB
- Download14 RAB Exterior Fixture.pdf.pdf82 KB
- Download1333ND26RNB190033 0004 Ext Due and RFIs.pdf.pdf1.2 MB
- DownloadSolar Lighting Replacement Site Visit.pdf.pdf38 KB
- Download1333ND26RNB190033 001.pdf.pdf1.1 MB
- Download05 B4 AsBuilts.pdf.pdf324 KB
- Download15 Solar Lighting Upper Site Replacement-Elec Specs.pdf.pdf654 KB
- Download1333ND26RNB190033 0003 Minor Revisions.pdf.pdf1.5 MB
Contacts
Similar contracts
- Audio Visual Console Upgrade (Brand Name or Equal)Due Aug 18, 2026
- US Coast Guard Air Station Savannah GeneratorGeorgiaDue Aug 21, 2026
- N--MORA-PARADISE FIBER INSTALLDue Aug 17, 2026
- FLUKE Analyzer Test Equipment CalibrationWashingtonDue Aug 17, 2026
- 19UZ8026Q0025 MPR EquipmentToshkentDue Aug 25, 2026
- Audio Visual System Upgrade G.V. (Sonny) Montgomery VA Medical CenterMississippiDue Aug 17, 2026