MMW Chiller For Balance of Plant
- Response deadline
- Sep 9, 2026 Due in 11 days
- Date posted
- Aug 28, 2026
- Source
- Open notice
Description
8/28/26 Amendment No. 1 extends the due date to 9/9/26 12:00Pm MDT. 7/16/26 Amendment No. 1 posted to address the technical questions received. At this time we do not need to extend the due date. This procurement is for a single, self-contained, outdoor-rated 20-ton air-cooled industrial process chiller system complete with an integrated glycol pump and glycol buffer tank system. The primary function of this equipment is to cool and circulate a 50%/50% propylene glycol/water mixture at a set temperature of 35°F (with a flow rate of 60–90 GPM) to condense and dry water out of a hydrogen stream generated by a proton exchange membrane (PEM) electrolyzer. The system must operate under variable loads and survive extreme ambient outdoor conditions at an elevation of 6,000 feet.
Classifications
Documents (4)
- Amendment No. 1 - MMW Chiller for Balance Plant.pdf.pdf218 KBNot yet available
- Amendment No. 2 - MMW Chiller for Balance Plant.pdf.pdf791 KBNot yet available
- Request For Quote_ 2026030648_ MMW Chiller for Balance of Plant.pdf.pdf157 KBNot yet available
- Attachment No. 1 - Technical Specifications_MMW Chiller System.pdf.pdf154 KBNot yet available
Contacts
Similar contracts
- Liquid Nitrogen FreezerIowaDue Aug 30, 2026
- NEC - High Efficiency AHU Air FilterPanamáDue Sep 15, 2026
- 40 TON PACKAGE CHILLER - FORT BRAGGDue Sep 4, 2026
- Trane CH-3 Centrifugal ChillerNew YorkDue Sep 8, 2026
- 6515--Helmer Fridge PedestalsDue Sep 2, 2026
- 500-Ton Trailer-Mounted Air-Cooled ChillerFloridaDue Sep 10, 2026