Jeffco Airtanker Base Flooring Replacement
- Response deadline
- Aug 21, 2026 Due in 4 days
- Date posted
- Aug 17, 2026
- Source
- Open notice
Description
Amendment - A0001 - The purpose of this amendment is to provide question and answers as well as the Sign In Sheet from the recent site visit. Flooring Colors and existing epoxy photos This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued for the the Jeffco ATB Flooring Replacement. The scope of the work includes the removal of existing flooring and installation/placement of new epoxy flooring, vinyl flooring, transitions, and rubber cove base. Refr to SOW for full project requirement. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238190 – Other Foundation, Structure, and Building Exterior Contractors. (Epoxy application contractors) The small business size standard is $19M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. A Site Visit will be held on July 29th 2026 at 1000 am MT. Refer to Solicitation for location and contact information. Questions are due 8-3-2026 at 1000 am MT Quotes are due 8-21-2026 at 1000 am MT
Classifications
Documents (16)
- C5_Attach 2_SOI.xlsx.xlsx13 KBNot yet available
- 1240LT26Q0144_Final.pdf.pdf416 KBNot yet available
- C5_Attach 3_Maps_Floor Plan.pdf.pdf288 KBNot yet available
- IMG_0782.jpeg.jpeg3.2 MBNot yet available
- IMG_0484.jpeg.jpeg3.3 MBNot yet available
- C5_Attach 4_WD 20260018.pdf.pdf38 KBNot yet available
- IMG_0487.jpeg.jpeg3.5 MBNot yet available
- IMG_0585.jpeg.jpeg2.8 MBNot yet available
- IMG_0581.jpeg.jpeg2.4 MBNot yet available
- IMG_0485.jpeg.jpeg2.4 MBNot yet available
- C5_Attach 1_SOW.pdf.pdf368 KBNot yet available
- 1240LT26Q0144_A0001_S.pdf.pdf184 KBNot yet available
- IMG_0781.jpeg.jpeg3.1 MBNot yet available
- Attach 05_Q_A_Sign in sheet.pdf.pdf798 KBNot yet available
- IMG_0486.jpeg.jpeg2.6 MBNot yet available
- IMG_0573.jpeg.jpeg2.3 MBNot yet available
Contacts
Similar contracts
- Taylorsville Lake Control Tower Security Door Project - ConstructionDue Sep 8, 2026
- 9515-- FY26: Terrace Canopy Installation One-Time ContractDue Aug 21, 2026
- Barren River Lake Control Tower Fall Protection Upgrades - ConstructionDue Sep 3, 2026
- Monument Sign - Natick Soldiers Systems CenterMassachusettsDue Aug 11, 2026
- K3 Barn Repairs, Prairie du Sac, WisconsinWisconsinDue Aug 24, 2026
- Z--Hungry Horse Power Plant Turbine Runner CavitationDue Aug 13, 2026