Jeffco Airtanker Base Flooring Replacement
- Response deadline
- Aug 21, 2026 Closed
- Date posted
- Aug 3, 2026
- Source
- Open notice
Description
Amendment - A0001 - The purpose of this amendment is to provide question and answers as well as the Sign In Sheet from the recent site visit. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued for the the Jeffco ATB Flooring Replacement. The scope of the work includes the removal of existing flooring and installation/placement of new epoxy flooring, vinyl flooring, transitions, and rubber cove base. Refr to SOW for full project requirement. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238190 – Other Foundation, Structure, and Building Exterior Contractors. (Epoxy application contractors) The small business size standard is $19M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. A Site Visit will be held on July 29th 2026 at 1000 am MT. Refer to Solicitation for location and contact information. Questions are due 8-3-2026 at 1000 am MT Quotes are due 8-21-2026 at 1000 am MT
Classifications
Documents (7)
- DownloadC5_Attach 2_SOI.xlsx.xlsx13 KB
- Download1240LT26Q0144_Final.pdf.pdf416 KB
- DownloadC5_Attach 3_Maps_Floor Plan.pdf.pdf288 KB
- DownloadC5_Attach 4_WD 20260018.pdf.pdf38 KB
- DownloadC5_Attach 1_SOW.pdf.pdf368 KB
- Download1240LT26Q0144_A0001_S.pdf.pdf184 KB
- DownloadAttach 05_Q_A_Sign in sheet.pdf.pdf798 KB
Contacts
Similar contracts
- Cuga- 2Inch Steel HandrailsDue Sep 23, 2026
- Cuga- 2Inch Steel HandrailsDue Sep 23, 2026
- Exterior Porches, Roofs and Stairs (3) ReplacementDistrict of ColumbiaDue Sep 21, 2026
- Repair by Replacement EDINBURG-KERRVILLE BLDG 4 Dip Vat RedesignTexasDue Sep 23, 2026
- Bldg. 514 Subfloor Removal & Epoxy CoatingWashingtonDue Sep 21, 2026
- Z--Ncr-Nama: Holding Cell Door RepairDue Sep 17, 2026