Forest wide Decommissioning, Gunnison National Forest Colorado
- Response deadline
- Sep 22, 2026 Due in 4 days
- Date posted
- Sep 18, 2026
- Source
- Open notice
Description
The purpose of this amendment is the following: 1.Revision- Revision to C05_1240LT26Q0184 1442_Revised Factor 1 Technical Approach Page 20 - Removed Soap Creek amended with: Removal of toilet building located at the Ward Lake Campground, properly abandoned two water wells (Lakeview and Beaver Lake CGs), and removal of water concrete tank at Beaver Lake CG. 2. Consolidated questions and answers C06 Attach 6_Questions Answered The Grand Mesa, Uncompahgre and Gunnison National Forests are working on removing unusable structures within the forests. The work on this project will be on three different campgrounds: Ward Lake located in Delta County Colorado; Beaver Lake located in Gunnison County Colorado and Lakeview also located in Gunnison County Colorado. The project consists of removal of toilet building located at the Ward Lake Campground, properly abandoned two water wells (Lakeview and Beaver Lake CGs), and removal of water concrete tank at Beaver Lake CG.
Classifications
Documents (9)
- C05_Attach 5 - Water Well Regulations 1 (1).pdf.pdf8.2 MBNot yet available
- C05 1240LT26Q0177 1442_Final.pdf.pdf514 KBNot yet available
- C05_Attach 4 - Wage Determination.pdf.pdf1.9 MBNot yet available
- C05 1240LT26Q0177 Amendment.pdf.pdf85 KBNot yet available
- C05_Attach 3 - Code of Colorado Regulations.pdf.pdf4.0 MBNot yet available
- C05 1240LT26Q0177 1442_Revised.pdf.pdf458 KBNot yet available
- C06_Attach 6_Questions Answered.pdf.pdf802 KBNot yet available
- C05_Attach 1 - Schedule of Items.xlsx.xlsx15 KBNot yet available
- C05_Attach 2 - SOW_Forestwide Decommissioning.docx.docx10.4 MBNot yet available
Contacts
Similar contracts
- Fort Pierce Harbor Maintenance Dredging, St. Lucie County, FloridaDue Oct 22, 2026
- John Day Dam Fish Pump Rehabilitation ProjectOregonDue Sep 21, 2026
- Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation ProjectNew JerseyDue Oct 19, 2026
- Pointe Mouillee Confined Disposal Facility Cells 1 and 2 Fill ManagementDue Oct 13, 2026
- GAOA Sand Pond Trail Boardwalk Replacement Tahoe NFCaliforniaDue Sep 25, 2026
- Corning and Holt 10 Levee RepairsDue Sep 28, 2026