CO NP ROMO 407(1) Holzwarth Culvert
- Response deadline
- Oct 20, 2026 Due in 34 days
- Date posted
- Sep 16, 2026
- Source
- Open notice
Description
SOLICITATION ID: 6982AF27B000004 PROJECT NUMBER: CO FTNP ROMO 407(1) PROJECT NAME: Holzwarth Culvert PROJECT DESCRIPTION: This project will replace the deficient Holzwarth Culvert (Structure No. 1520-029S), a six-barrel corrugated metal arch pipe culvert on the Holzwarth Access Road with a steel girder bridge. Located in Rocky Mountain National Park, approximately nine miles north of Grand Lake, CO, along US HWY 34 at an elevation of 8,900 feet, the culvert conveys flow from the Colorado River and provides access to the Holzwarth Historic Site. The purpose of this project is to prevent future roadway damage and flooding while maintaining access to employee housing, the historic site, and National Park Service and Forest Service recreation opportunities. SCOPE OF THE WORK: The project will consist of removal of the existing six barrel culvert and construction of a new steel girder bridge with a cast in place concrete deck. New bridge abutments and micropiles. Temporary stream diversion and riprap. New aggregate roadway surfacing. Relocation of an existing electrical line. Relocation of existing historic head gates into a new concrete slab. The site is accessible on foot a quarter mile past the locked gate at the south end of the Holzwarth Historic Site Parking Lot and along the Holzwarth Culvert Access Road. The Holzwarth Culvert Access Road is approximately 13’ wide with tight turns. Temporary widening will be necessary to prevent truck off tracking on to sensitive environmental resources. A temporary truck turnaround will also be necessary as no construction access is allowed more than 100’ west of the bridge. PRINCIPAL WORK ITEMS: 20304-2000 Removal of Bridge: 1 EACH 30202-2000 Roadway Aggregate, Method 2: 120 TON 55504-0000 Prefabricated Steel Bridge (10’ wide x 48’ long modular steel vehicular bridge): 1 LPSM 56701-0000 Micropile (8.68” dia.): 180 LNFT 62801-0000 Temporary Stream Diversion: 1 LPSM ANTICIPATED SCHEDULE: Advertisement – September 2026 Award – December 2026 NTP – December 2026 Contract Completion – November 2027 ESTIMATED COST RANGE: Total estimated cost between $700,000 and $2,000,000.
Classifications
Documents (9)
- Plans CO FTNP ROMO 407(1).pdf.pdf47.0 MBNot yet available
- FP-24 Standard Specifications for Construction FHWA Federal Hwy Projects.pdf.pdf5.7 MBNot yet available
- Hydraulics Report CO FTNP ROMO 407(1).pdf.pdf11.2 MBNot yet available
- Geotech Report CO FTNP ROMO 407(1).pdf.pdf33.5 MBNot yet available
- Holzwarth_Physical_Design_Data.zip.zip557 KBNot yet available
- XS CO FTNP ROMO 407(1).pdf.pdf1003 KBNot yet available
- Culvert Inspection Report CO FTNP ROMO 407(1).pdf.pdf3.1 MBNot yet available
- 6982AF27B000004.pdf.pdf2.3 MBNot yet available
- Wetlands_Waters.zip.zip53 KBNot yet available
Contacts
Similar contracts
- OHV Trail MaintenanceCaliforniaDue Sep 24, 2026
- AK FLAP ANCHORAGE 2021(1), Far North Bicentennial Park EnhancementsAlaska
- Aquilla Crest Shoulder Repairs and Whitney Shoreline AbatementDue Sep 18, 2026
- Repair Aircraft Hangar Apron Concrete - Air Station North BendOregonDue Sep 21, 2026
- Solicitation is Restricted to the Current Region 3 FERM BPA Holders - USDA Forest ServiceNew MexicoDue Sep 19, 2026
- ZTL Childcare Facility Paving ProjectGeorgiaDue Sep 17, 2026