AMENDMENT 001 - ODR Countertop & Cabinets Replacement
- Response deadline
- Sep 16, 2026 Due in 14 days
- Date posted
- Sep 2, 2026
- Source
- Open notice
Description
AMENDMENT 001: Updated Notice ID from FA254326Q0035 to FA254326R0012. This update is also reflected on the Request for Proposal (RFP) V2. All other terms and conditions remain unchanged. The Buckley SFB Outdoor Recreation (ODR) facility (Bldg. 1022) is upgrading its reception area to improve service delivery and organizational workflow. This project involves the complete demolition of the existing front desk and the single-phase installation of a new, ADA-compliant L-shaped front counter paired with a structured, three-tiered back-wall storage system. The upgraded reception counter features a durable, seamless 100% acrylic surface with two 42-inch high caps and a 30-inch high accessible section, while the rear storage unit integrates lockable lower cabinets, a middle whiteboard layer, and open overhead shelving. Additionally, the contractor will install two ski desks, route supporting electrical conduits, and complete necessary plumbing utility hookups without disruption to ongoing operations. For additional details please reference the Statement of Work (SOW). Site Visit: As prescribed in RFO 52.237-1, Site Visit, all prospective offerors are urged and expected to inspect the site where the work will be performed. The site visit will be conducted on Tuesday, 01 September 2026 at 10:00 A.M. Mountain Standard Time (MST) at BSFB. We will meet at the Buckley SFB Outdoor Recreation Facility (Bldg. 1022). Any personnel that require base access shall submit the BSFB Access Form 128 (Attachment 2) to the Contract Specialist (CS) and Contracting Officer (CO) no later than Wednesday, 26 August 2026 at 10:00 A.M. Mountain Standard Time (MST) in advance of the site visit with the Name, DOB, and Driver’s License Number/State, and Foreign Status.
Classifications
Documents (11)
- Specifications - Front Desk at Buckley SFB ODR.pdf.pdf195 KBNot yet available
- Atch 1_ODR Countertop and Cabinets_SOW.pdf.pdf182 KBNot yet available
- Atch 6_Request for Information (RFI) Template.pdf.pdf96 KBNot yet available
- Atch 4_Wage Determination_CO20260016.pdf.pdf1.8 MBNot yet available
- ODR Countertop and Cabinets_Request for Proposal_V2-JKD.pdf.pdf259 KBNot yet available
- Outdoor Rec 5.jpg.jpg161 KBNot yet available
- Buckley-MainDesk-Visitor-View1_counter new design 2.jpg.jpg378 KBNot yet available
- Buckley-MainDesk-Visitor-View2_counter new desgin.jpg.jpg382 KBNot yet available
- Outdoor Rec 4.jpg.jpg176 KBNot yet available
- Atch 3_NAF_Standard_Clauses_Incorporated_By_Reference_Full_Text CAO 30 May 25.pdf.pdf910 KBNot yet available
- Atch 5_BSFB Form 128 Template.pdf.pdf162 KBNot yet available
Contacts
Similar contracts
- FRC Ground Level HVAC and Roof ReplacementTexasDue Sep 9, 2026
- 573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMCFloridaDue Sep 9, 2026
- Replacement of Conference Room, and Command Suite WindowsAlaskaDue Sep 9, 2026
- FCI Seagoville Hot Water Generator ReplacementTexasDue Sep 16, 2026
- MAHG 17-1095 Stennis HallMississippiDue Sep 9, 2026
- Z--DENA 332037 Eielson Roof ReplacementDue Oct 1, 2026