Steam Tunnel Ventilation Replacement
- Response deadline
- Aug 5, 2026 Closed
- Date posted
- Jun 17, 2026
- Source
- Open notice
Description
SEE ATTACHMENTS FOR FULL PROJECT DETAILS Project: Construction Services/Steam Tunnel Ventilation System Replacement, NIST, Boulder, CO This acquisition is a 100% Small Business Set-Aside. The NAICS for this acquisition is 236220; the Small Business Size Standard is $45.0 Million. The purpose of this project is to replace the existing tunnel ventilation system with steam heating coils with (2) natural gas indirect fired make up air units (MAU’s). This construction effort will procure and deliver a complete, operational tunnel ventilation system, including removal of existing equipment, installation MAU’s, and all associated systems required for safe, reliable, and continuous ventilation system. Work will be planned and phased to be performed between the months of May 1 through October 31, mitigating the chances for pipes to freeze.
Classifications
Documents (1)
- Download1333ND26RNB190032 Steam Tunnel Ventilation NIST Boulder CO.pdf.pdf6.6 MB
Contacts
Similar contracts
- P530 Aircraft Intermediate Maintenance Facility, Kadena Air Base, Okinawa, JapanOkinawaDue Oct 30, 2026
- | 521-24-102 | Renovate Wards 2K and 2B for Optometry/Ophthalmology Clinical UseAlabamaDue Nov 12, 2026
- 635-21-139 | Repair Parking Garage 1 Deficiencies | CON (VA-26-00041470) (NRM - SCIP# VHA19-635-2023-52398)OklahomaDue Oct 22, 2026
- P1050 Maintenance Hangar at Nas Jrb Fort Worth, TxTexasDue Oct 29, 2026
- Department of Veteran Affairs - Personnel Security Adjudication CenterDue Nov 12, 2026
- FY29 PN108808 Nonorganizational Vehicle Parking Garage at Tripler Army Medical Center on Oahu, Hawaii