Shadow Mountain Building 97 Heat Cable and Snow Retention, Grand Lake, CO
- Response deadline
- Jun 2, 2026 Closed
- Date posted
- May 7, 2026
- Source
- Open notice
Description
Amendment 00001 (A0001) - A Site Visit will be held on May 12th, 2026 at 1100 AM MDT. All interested parties are to meet at: 34 Co Rd 66, Grand Lake, CO 80447 AND contact Juan Londono @ juan.londono@usda.gov to confirm attendance. Refer to Attach 5 for meeting location. ALL DOCUMENTS ARE LOCATED IN ATTACHMENTS/LINKS Project Title: Shadow Mountain Building 97 Heat Cable and Snow Retention, Grand Lake, CO Description: The Contractor is responsible for providing all labor, materials,equipment, and oversight required to install heat tape and cabling systems on the roof, gutters, and downspouts of Building 97's North and South sections. This scope includes reconditioning the electrical system to provide dedicated power to both sides of the building, ensuring full functionality of the new heating systems. Additionally, the Contractor will install new snow retention guards on both the North and South elevations. A site visit will not be held. PSC Code: 5650 -Roofing and Siding Materials NAICS Code: 238210 - Electrical Contractors and Other Wiring Installation Contractors Size Standard: $19M Project Magnitude: Between $25,000 and $100,000
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- Installation of Walkway LightsDue Oct 15, 2026
- UPS RefurbishmentWashingtonDue Oct 29, 2026
- Repair Electrical SystemsDue Nov 12, 2026
- Triennial Electrical Maintenance Fy26 Amendment #3 Q&A Response, Scope Update, Drawings and Panel Lists New Deadline: 10/27/26 Pop Start Date: 12/01/2026LouisianaDue Oct 27, 2026
- Air Compressor RelocationDistrict of ColumbiaDue Oct 16, 2026
- Brooklyn Upgrade Life Safety/Critical Branch Electrical Construction - 630A4-16-430New YorkDue Oct 30, 2026