Safety Shower and Eyewash Corrections Phase 1
- Response deadline
- Jun 30, 2026 Closed
- Date posted
- Jun 18, 2026
- Source
- Open notice
Description
June 12, 2026 - added attachment for site visit attendance REFER TO ATTACHMENTS FOR DETAILED INFORMATION REGARDING SOLICITATION: 1. 1333ND26RNB190015 Eyewash Phase 1 NIST Boulder CO.pdf, and 2. OFPM Site Standards.zip Background Information The Department of Commerce (DOC) campus is a research and development complex located at 325 Broadway in Boulder, Colorado. The National Institute of Standards and Technology (NIST) is the primary occupant, National Oceanic Atmospheric Administration (NOAA) and National Telecommunications and Information Administration (NTIA) also have a presence on campus. NIST’s Office of Facilities and Property Management (OFPM) is responsible for maintaining and renovation of spaces which consist of laboratories, office space and facilities maintenance areas throughout the campus. Annual testing of safety showers and eyewashes across campus have shown a significant number of fixtures failing to meet the ANSI Z358.1-2014 (Emergency Eyewash & Shower Standard), mostly shower/eyewash combination fixtures that fail during simultaneous operation. OFPM conducted a study which identified deficient fixtures, determined the cause of failure, and recommended necessary actions to bring the fixtures into compliance. Purpose Many of the deficiencies identified have been remedied by NIST OFPM employees completing the recommended corrective actions. However, the scope in some buildings/areas is large enough to warrant contracted construction: Building 22 (B22), Building 25 (B25), Building 42 (B42/Central Utility Plant – CUP), Building 1 (B1), and Building 2 (B2) all have emergency fixtures needing attention. The intent of this project is to remedy the remaining deficiencies such that all emergency fixtures are compliant with ANSI Z358.1-2014. This Design-Build project is structured with B22 as the base scope and four option CLINs for the other abovementioned areas. Recommendations presented in this SOW and supporting documents are intended to be an optional starting point. Additional design and coordination will be necessary to proceed with any of the recommendations. It is the responsibility of the contractor to evaluate and confirm the viability of the recommendations, provide an engineered design, and execute the construction to successfully bring all fixtures within project scope into compliance. PLACE OF PERFORMANCE: NIST Boulder Campus, Boulder, CO
Classifications
Documents (5)
Contacts
Similar contracts
- FY 2026 Preventive Maintenance Services to the Building Automation SystemEstuaireDue Oct 19, 2026
- Z--Rosebud Agency HVAC UpgradeDue Oct 23, 2026
- Z--EROS Removal and replacement of chilled and condenDue Nov 4, 2026
- Condenser Coils Replacement for the VA Illiana Health Care System (VAIHCS), located at 1900 E. Main Street, Danville, IL 61832Due Nov 4, 2026
- IDIQ, Joc for Plumbing, Heating, Air Conditioning Projects at Marine Corps Logistics Base Barstow, Marine Corps Air-Ground Combat Center 29 Palms, Marine Corps Mountain Warfare Training Center Bridgeport, and Naval Air Weapons Station China Lake, Ca AorDue Oct 20, 2026
- Condenser Coils Replacement for the VA Illiana Health Care System (VAIHCS), located at 1900 E. Main Street, Danville, IL 61832Due Nov 4, 2026