Pike Underground Utility Upgrade
- Response deadline
- Jul 20, 2026 Closed
- Date posted
- Jun 25, 2026
- Source
- Open notice
Description
A0001 - The purpose of this Amendment is to: 1. Offer an Additional Site Visit 2. Extend the Due Date 3. Address Questions See attached A0001 for Details Description This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1240LT26Q0090 is issued as a Request for Quotation (RFQ) for the sewer line repairs, leach field, waterlines, septic tank replacement, and all other work associated with these repairs in accordance with the approved final drawings, specifications and provisions of the contract This acquisition is set-aside for 100% small business concerns. The applicable North American Industry Classification Standard Code is 237110 The small business size standard is $45M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. A Site Visit will be held on June 23rd, 2026 at 1000 am MT starting at Lake George Work Center. Refer to Solicitation for details See attached Solicitation, Statement of Work, Drawings, and Construction Manuals for full details
Classifications
Documents (7)
- DownloadC05_Attach 3_PUUU_Con Manual.pdf.pdf949 KB
- DownloadC05_Attach 2_SOW.pdf.pdf316 KB
- DownloadC05_Attach 1_SOI_PUUU.xlsx.xlsx13 KB
- DownloadC05_Attach 4_PUUU_Drawings.pdf.pdf2.2 MB
- Download1240LT26Q0090_Final.pdf.pdf425 KB
- DownloadC05_Attach 5_WD-CO20260019-28.pdf.pdf116 KB
- Download1240LT26Q0090_A0001_Final.pdf.pdf260 KB
Contacts
Similar contracts
- Install Sewer Lift Station Pumps and Controls, Stoneville, MississippiMississippiDue Sep 15, 2026
- NRM-CON-663A4-27-001 Under Dispenser Containment (UDC) and sump installation at VAMC American LakeDue Sep 11, 2026
- Yellowstone - Mammoth Water Line ReplacementDue Sep 15, 2026
- Y--2026 Marcott Coulee PipelineDue Sep 10, 2026
- MAHG251029 Repair Water Tower #8MississippiDue Sep 15, 2026
- Norwood Horse Pasture WellColoradoDue Sep 22, 2026