NIST Boulder Solar Lighting Upper Site Replacement
- Response deadline
- Aug 13, 2026 Due in 27 days
- Date posted
- Jul 10, 2026
- Source
- Open notice
Description
The National Institute of Standards and Technology (NIST) Boulder Campus seeks a qualified contractor to replace aging solar-powered exterior pole luminaires with new hard-wired LED pole luminaires throughout selected areas of the campus. Work includes demolition and removal of existing solar lighting systems, design and installation of new pole bases and luminaires, photometric analysis, structural pole base design stamped by a licensed Colorado Professional Engineer, and installation of new electrical circuits originating from nearby building panelboards. Construction activities include trenching, backfilling, restoration of landscaped and hardscaped areas, equipment labeling, and coordination of electrical shutdowns. All work must comply with NEC, NIST site standards, and applicable safety and security requirements. Important Dates: List of Individuals Attending Site Visit Due: Friday, July 17, 2026 to Lauren.Lopez@nist.gov cc: Shawn.Borisow@nist.gov Site Visit: Tuesday, July 21, 2026 @ 1:00pm at Building 25 Questions Due: July 30, 2026 @ 5:00pm to Lauren.Lopez@nist.gov cc: Shawn.Borisow@nist.gov Proposals Due: August 13, 2026 @ 5:00pm to Lauren.Lopez@nist.gov cc: Shawn.Borisow@nist.gov
Classifications
Documents (13)
- Download07 B25 AsBuilts.pdf.pdf971 KB
- Download13 NIST Elec Site Standards.pdf.pdf170 KB
- Download09 HighSpeedSwith Elec AsBuilts.pdf.pdf4.7 MB
- Download11 Existing Utility Plan and Testholes.pdf.pdf9.6 MB
- Download1333ND26RNB190033.pdf.pdf3.1 MB
- Download06 B22 AsBuilts.pdf.pdf147 KB
- Download08 B51 Elec AsBuilts.pdf.pdf1.4 MB
- Download12 Front Range Areas 1 - 4 Existing Utility Plan and Testholes.pdf.pdf9.6 MB
- Download10 Laydown Yard Elec 1Line.pdf.pdf818 KB
- Download14 RAB Exterior Fixture.pdf.pdf82 KB
- Download1333ND26RNB190033 001.pdf.pdf1.1 MB
- Download05 B4 AsBuilts.pdf.pdf324 KB
- Download15 Solar Lighting Upper Site Replacement-Elec Specs.pdf.pdf654 KB
Contacts
- Shawn Borisow
- Lauren Lopez