NIST Boulder Sitewide Exterior Lighting Inspection and Repair
- Response deadline
- Jul 24, 2026 Closed
- Date posted
- Jul 20, 2026
- Source
- Open notice
Description
The contractor shall provide all labor, supervision, management, materials, tools, equipment, transportation, and incidentals necessary to perform monthly audits, inspections, maintenance, repair, replacement, and installation of exterior lighting systems at the NIST Boulder Campus and, as authorized, the Ft. Collins Radio Station. The scope includes all exterior lighting fixtures identified on the Site Exterior Lighting Map, including pole-mounted luminaires (120V and 277V), solar-powered lighting, walkway lighting, and bollards, as well as any additional exterior lighting discovered during performance. Monthly audits shall include inspection of 100% of fixtures during hours of darkness, documentation of deficiencies, and submission of reports identifying recommended corrective actions and cost estimates. Repair and replacement services shall be performed only upon written authorization from the Contracting Officer and may include installation of approved-equivalent lighting products meeting specified performance requirements. The contractor shall provide all necessary access equipment, comply with all applicable environmental and hazardous waste regulations, coordinate activities through the Contracting Officer’s Representative (COR), and perform work in a manner that minimizes disruption to ongoing research operations. Payment for repairs will be limited to authorized work within the contract scope and established funding limits. Important Dates: List of Individuals Attending the Site Visit: 7/2/2026 Site Visit: 7/7/2026 @ 1:30 Building 1 Entrance Questions Due: 7/9/2026 Proposals Due: 7/24/2026
Classifications
Documents (8)
- Att 05 NIST Release of Claims.pdf.pdf75 KBNot yet available
- Att 02 Copy of Safety Plan Checklist.xlsx.xlsx37 KBNot yet available
- Att 04 Site Exterior Lighting Map.pdf.pdf344 KBNot yet available
- Att 06 JHA .xlsx.xlsx40 KBNot yet available
- 1333ND26QNB190295001.pdf.pdf1.2 MBNot yet available
- ATT 01 NIST Boulder General Contractor Requirements - Rev C.docx.docx606 KBNot yet available
- 1333ND26QNB190295.pdf.pdf9.1 MBNot yet available
- Att 03 Risk Levels for Service Contract Personnel-Form.doc.doc67 KBNot yet available
Contacts
Similar contracts
- Albany Transformer Testing & ServiceDue Oct 9, 2026
- Albany Transformer Testing & ServiceDue Oct 9, 2026
- CON-NRM-663A4-24-209 Replace Fire Suppression Systems BLDG 61WADue Oct 7, 2026
- Request for Quotes - Rental of UPS for Phone RoomDue Oct 2, 2026
- Albany Transformer Testing & ServiceNew YorkDue Oct 9, 2026
- Fire Alarm and Mass Notification System Upgrades for DDJC, Tracy, CADue Oct 13, 2026