NIST Boulder Building 2 1330 Fume Hood Replacement
- Response deadline
- Jul 23, 2026 Due in 6 days
- Date posted
- Jul 9, 2026
- Source
- Open notice
Description
The project consists of construction services to remove and replace an existing laboratory tabletop fume hood and associated rooftop exhaust fan located in Building 2, Room 1330 at the NIST Boulder Campus. Work will include demolition and replacement of existing countertops, sink, base cabinetry, plumbing connections, and associated architectural finishes. Mechanical work includes removal of the existing fume hood, ductwork, and rooftop exhaust fan and installation of a new walk-in fume hood, hazardous exhaust fan, exhaust stack, and duct connections. Electrical work includes removal and installation of circuits serving the fume hood and exhaust fan, installation of cable tray and dedicated receptacles for laboratory equipment, reconnection of lightning protection systems, and bonding of the hood and exhaust system. Plumbing work includes reconnecting existing piping to a new sink and eyewash station. Fire alarm work includes installation of a supervised fume hood panic alarm system connected to the building fire alarm panel. The contractor will also provide structural design and installation of exhaust fan stack supports, perform ASHRAE 110 performance testing of the hood and exhaust system, and coordinate construction activities with NIST personnel. Important Dates: List of Individuals due for Site Visit: Monday, June 15, 2026 Site Visit: Wednesday, June 17, 2026 @ 2:30 PM outside Building 2 Questions Due: Monday, June 22, 2026 Proposals Due: Thursday, July 23, 2026 Please see Instructions to Offerors on Page 111 of the solicitation for details around registering for the site visit.
Classifications
Documents (14)
- DownloadAmend 0002 Att 03.pdf.pdf1.1 MB
- DownloadAmend 0002 Att 06.zip.zip214 B
- DownloadAtt 01 - NIST Boulder General Contractor Requirements - Rev C.pdf.pdf635 KB
- DownloadAtt 02 - APP A _ NIST Safety Plan Checklist Template.pdf.pdf174 KB
- DownloadAmend 0002 Att 05.pdf.pdf4.7 MB
- DownloadAmend 0002 Att 02.pdf.pdf1.7 MB
- DownloadAtt 03 - Drawings.pdf.pdf4.4 MB
- Download1333ND26RNB190028.pdf.pdf1.8 MB
- Download1333ND26RNB190028 0002.pdf.pdf663 KB
- Download1333ND26RNB190028 001.pdf.pdf223 KB
- DownloadAtt 05 - Wage Determination.pdf.pdf63 KB
- DownloadAmend 0002 Att 04.pdf.pdf3.6 MB
- DownloadAtt 04 - Specifications.pdf.pdf1.7 MB
- DownloadAmend 0002 Att 01.pdf.pdf4.4 MB
Contacts
- Lauren Lopez
- Travis Zoellner