NIST Boulder B1 Wing 6 Seal Above Hallway Doors
- Response deadline
- Jul 15, 2026 Closed
- Date posted
- Jun 12, 2026
- Source
- Open notice
Description
The project consists of extending the Building 1 Wing 6 demising wall vertically to the structural concrete deck above to eliminate a 2–3.5 ft gap and thermally and mechanically isolate Wing 6 from the Spine corridor. Work also includes sealing penetrations and abandoned penetrations with fire‑rated materials where the wall separates the Women’s restroom from the Spine corridor. An optional scope may include reconstructing storage room #4089, installing hollow metal door frames and doors with security hardware, sealing wall penetrations with fire-rated sealant, providing additional fire sprinkler protection as required, installing interior lighting, and installing NIST-standard interior signage. The contractor will provide all labor, materials, site protection, debris removal, and coordination required to complete the work in accordance with NIST campus safety and construction requirements. Important Dates: List of Individuals due for Site Visit: June 30, 2026 Site Visit: July 2, 2026 @ 1:00 PM in front of Building 1 Questions Due: July 6, 2026 Proposals Due: July 15, 2026
Classifications
Documents (5)
- DownloadAtt 01 - NIST Boulder General Contractor Requirements.pdf.pdf633 KB
- DownloadAtt 02 - APP A _ NIST Safety Plan Checklist Template.pdf.pdf174 KB
- DownloadAtt 04 - Wage Determination.pdf.pdf63 KB
- Download1333ND26RNB190030.pdf.pdf1.9 MB
- DownloadAtt 03 - Boulder Laboratories Physical Access Control Standards.pdf.pdf359 KB
Contacts
- Lauren Lopez
- Travis Zoellner