Jeffco Airtanker Base Flooring Replacement
- Response deadline
- Aug 21, 2026 Due in 24 days
- Date posted
- Jul 22, 2026
- Source
- Open notice
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued for the the Jeffco ATB Flooring Replacement. The scope of the work includes the removal of existing flooring and installation/placement of new epoxy flooring, vinyl flooring, transitions, and rubber cove base. Refr to SOW for full project requirement. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238190 – Other Foundation, Structure, and Building Exterior Contractors. (Epoxy application contractors) The small business size standard is $19M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. A Site Visit will be held on July 29th 2026 at 1000 am MT. Refer to Solicitation for location and contact information. Questions are due 8-3-2026 at 1000 am MT Quotes are due 8-21-2026 at 1000 am MT
Classifications
Documents (5)
- C5_Attach 2_SOI.xlsx.xlsx13 KBNot yet available
- 1240LT26Q0144_Final.pdf.pdf416 KBNot yet available
- C5_Attach 3_Maps_Floor Plan.pdf.pdf288 KBNot yet available
- C5_Attach 4_WD 20260018.pdf.pdf38 KBNot yet available
- C5_Attach 1_SOW.pdf.pdf368 KBNot yet available
Contacts
Similar contracts
- Monument Sign - Natick Soldiers Systems CenterMADue Aug 7, 2026
- Z--Grand Coulee Washington Power Plant Turbine RepairWADue Aug 5, 2026
- USCGC Maple Fantail awning fabrication and installationNCDue Jul 29, 2026
- Z1DA--542-21-113 | Correct FCA Deficiencies – Repair Water Penetration | NCO 4 Construction East (VA-26-00020634) (VA-26-00020634)Due Sep 2, 2026
- Monument Sign - Natick Soldiers Systems CenterMADue Aug 7, 2026
- 19CG5026R0010 - Front Perimeter Wall RepairCD-KNDue Aug 3, 2026