Civic AI
Civic AI
Procurement intelligence
SAM.gov1240BH26Q0028
Open

GAOA South Park Office Rehab Pike National Forest

AGRICULTURE, DEPARTMENT OF · CO
Response deadline
Aug 11, 2026
Due in 24 days
Date posted
Jul 8, 2026

Description

Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery for the following: 1. Remove and install new standing seam metal roof; including underlayment, ridge vent, flashing, drip edge, roof curbs, crickets, gutters, and downspouts. 2. Install roof, valley, gutter, and downspout ice/snow melt system including electrical circuits. 3. Interior and exterior modifications including remove carpet and install carpet tiles, replace stained and damaged acoustical panels and ceiling tiles, and seal windows. Also, install new insulation in the areas where the ceiling is dropped. 4. Install additional communication outlets and electrical for telecom. 5. Install chain link fence, personnel gate, motorized gate, and associated electrical and safeties.

Classifications

Documents (8)

  • C04 SF1442 1240BH26Q0028.pdf
    .pdf292 KBNot yet available
  • C04e Attachment 5 Site Visit Plan 1240BH26Q0028.pdf
    .pdf41 KBNot yet available
  • C04f Attachment 6 General Decision CO20260026 05182026.pdf
    .pdf1.7 MBNot yet available
  • C04d Attachment 4 SOI 1240BH26Q0028.xlsx
    .xlsx13 KBNot yet available
  • C04g Attachment 7 RFI Form 1240BH26Q0028.docx
    .docx29 KBNot yet available
  • C04a Attachment 1 SOW Fairplay Rehab 1240BH26Q0028.docx
    .docx20 KBNot yet available
  • C04c Attachment 3 Drawings Fairplay Rehab 1240BH26Q0028.pdf
    .pdf3.8 MBNot yet available
  • C04b Attachment 2 Specs Fairplay Rehab 1240BH26Q0028.pdf
    .pdf1.2 MBNot yet available

Contacts

Explore more