US 24, Green Mountain Falls Turn Lanes. Construct an Eastbound Right Turn lane to Green Mtn Falls Road and Construct a Westbound Left Turn accel lane from Green
- Response deadline
- Nov 5, 2026 Due in 21 days
- Date posted
- Oct 15, 2026
- Source
- Open notice
Description
US 24, Green Mountain Falls Turn Lanes. Construct an Eastbound Right Turn lane to Green Mtn Falls Road and Construct a Westbound Left Turn accel lane from Green Mtn Falls Road. Total widening each side will be 16.5 Feet. Work will include new guardrail at both turn lane locations, 5 new embankment protectors, extending the Box Culvert 5 feet and adding new wingwalls, creating a ditch with a gutter pan across the trail southwest of the intersection to solve current erosion problems, paving the access to Packard road and adding a Culvert and Gutter pan to assist with erosion problems in that location. Approximately 85 trees will need to be removed with this project as a part of the clearing process for construction. There will also be very minor widening at the SE corner of Green Mtn Falls Road where vehicles are currently driving in the dirt, it will be 4' total width to achieve a 2 Ft. wider turn radius. Total revegetation will be about 3 acres. Counties: EL PASO Eligibility: Eligible
Documents (1)
- Notice to ContractorsNot yet available
Similar contracts
- Co66 Platteville West (Mp 43.9-46.5). This Project Consists of Resurfacing Co66 Between Wcr9.5 and Wcr17, Signalizing the Intersection of Co66 and Wcr19, ImprovCODue Nov 5, 2026
- Us85L Mp 287.5 South of Nunn to Mp 301 South of CarrCODue Nov 5, 2026
- C27332CODue Oct 15, 2026
- C25453CODue Oct 22, 2026
- C24185CODue Oct 22, 2026
- C27269CODue Oct 29, 2026