C24443
- Response deadline
- Aug 13, 2026 Due in 5 days
- Date posted
- Jul 23, 2026
- Source
- Open notice
Description
NB I-225 FROM I-25 TO YOSEMITE. This project proposes to re-stripe NB I-225 from the SB I-25 ramp merge to the Yosemite Street overpass to eliminate a lane drop, creating a continuous four-lane configuration. All work occurs within existing pavement. Also includes replacement of an aging overhead sign structure, install erosion control, and upgrade guardrails. This project will address bottleneck congestion to improve overall traffic operations and safety. There is optional Pre-bid meeting scheduled on Tuesday, August 11 from 1:00 to 2:30pm. Meeting can be accessed via Google Meet joining info Video call link: https://meet.google.com/mjn-zfee-dkq Or dial: (US) +1 216-930-7647 PIN: 497 569 583# More phone numbers: https://tel.meet/mjn-zfee-dkq?pin=5397451637326 Counties: DENVER, ARAPAHOE Eligibility: Eligible
Documents (1)
- Notice to ContractorsNot yet available
Similar contracts
- NHC510-036CODue Aug 20, 2026
- ITS0252-521CODue Aug 27, 2026
- STA095A-027CODue Aug 27, 2026
- FSA0761-260CODue Aug 27, 2026
- NHPP0761-252-FBR 0761-253CODue Aug 13, 2026
- CC070-094CODue Jul 23, 2026