SAM.govW911S227U0015
Open
Clamp together Stainless Steel Duct System
- Response deadline
- Oct 13, 2026 Due in 8 days
- Date posted
- Oct 5, 2026
- Source
- Open notice
Description
Subject: Amendment 0002 repaired document KB Duct. Amendment 0001 removing Double Wall from this solicitation. Modular Clamp Together and Flanged Stainless Steel Ducting and Components. This document lists the basic physical and operational features needed for industrial grade stainless steel ducting. These parts make up a complete dust, mist, and fume collection system. The modular design allows fast setup, easy layout changes, leak resistance, and corrosion protection. When specific part numbers from KB Duct are referenced, they show the required design standard, build quality, dimensions, and performance. Any substitute items offered must match or exceed these key requirements.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
- eric.w.markland.civ@army.mil15206872958
Similar contracts
- Thermal Arc Sound Attenuation BoothDue Oct 13, 2026
- Thermal Arc Sound Attenuation BoothDue Oct 13, 2026
- KB Duct ListDue Oct 8, 2026
- Stud Assembly, TurnlockDue Oct 13, 2026
- Kb DuctingDue Oct 1, 2026
- Double Wall Insulated DuctingDue Sep 24, 2026