Civic AI
Civic AI
Procurement intelligence
SAM.gov70Z08526Q0027846
Open

USCGC Stratton Sewage Pump unit

Response deadline
Sep 10, 2026
Due in 10 days
Date posted
Aug 31, 2026

Description

STATEMENT OF WORK (SOW) CGC Stratton Sewage Pump Unit Background SF determined the sewage pump to be inoperable after discovering the pump leaking oil and hearing its bearings audibly failing. Objective CGC Stratton requires a replacement sewage pump for their sewage system. This Statement of Work (SOW) outlines the need for the requested part listed in Tech Pub 7804A References Technical Publication 7804A Sewage Pump Assembly with Motor Tasks Conduct procurement of the procurement of the parts listed in the table below: TABLE 1 – Required parts Description Part Number Quantity Sewage Pump Unit 5600268 1 The requested delivery date is no later than 02 March 2027 The provided item must be delivered as a complete order with standard commercial packaging to prevent damage while in transit. When the order is shipped, the company must provide the USCG point of contact with shipment tracking information to the given shipping address. If the item can be supplied by a local vendor, USCG can coordinate pickup from the supplier. If item is not local, it must be shipped to the following address: USCG Stratton 1 Eagle RD Alameda CA 94501 Point of Contact Please contact LTJG Maximos Brady at (360) 622-9196 or maximos.h.brady@uscg.mil with any questions regarding this SOW.

Classifications

Documents (1)

  • CGC Stratton SOW for Sewage Pump.pdf
    .pdf115 KBNot yet available

Contacts

Similar contracts

Explore more