USCGC BERTHOLF FQ2 FY27 Dockside Repair Services
- Response deadline
- Aug 24, 2026 Due in 8 days
- Date posted
- Jul 30, 2026
- Source
- Open notice
Description
This requirement is for the Contractor to provide all necessary labor, services, supplies, materials, equipment, power, accessories, personnel, and other things as necessary, except otherwise specified to perform dockside repairs to the USCGC BERTHOLF (WMSL-750), a 418' National Security Cutter in accordance with the solicitation, schedule and specifications. Work includes, but is not limited to the following: Fire Prevention, Provide Side Boat Davit, Renew Cargo Handling Elevator, Level 2 Incinerator, Inspect and Test Talon Grid (Type 18-08), Inspect and Test Elex Dry Air Compressor Equipment, Install Fantail Deck, Slip-Resistant, Preservation and Repair Tenting (Stern Deck), Provide Deck Covering (Slip-Resistant) Hangars, Renew Nulka Armor Pad Cover Plate, Renew Main Drainage Valves, Overhaul Fwd Grey Water Pump Discharge Check Valve, Renew Deck Covering (Polymeric), Repair and Seal Decks, Preserve Wave Guide Dryer Flexible Hoses, Renew Gas Turbine Moisture Separator Flexible Hoses, Renew Bow Thruster Flexible Hoses, Renew Anchor Windlass Flexible Hoses, Renew Tanks (MP Fuel Storage and Overflow), Clean and Inspect
Classifications
Documents (9)
- DownloadAttachment A_ BERTHOLF DS FQ2 FY27 - Specification Rev-0.pdf.pdf2.9 MB
- DownloadAttachment F- Non-Disclosure Agreement.pdf.pdf7.4 MB
- DownloadAttachment I- BERTHOLF DS FQ2 FY27 - Provisions and Clauses.pdf.pdf452 KB
- DownloadAttachment E - Standard WMSL Facility Access Instructions (Alameda).pdf.pdf263 KB
- DownloadAttachment B_ BERTHOLF DS FQ2 FY27 - Price Schedule.xls.xls41 KB
- DownloadAttachment D - Past Performance Questionaire (PPQ) USCGC BERTHOLF (WMSL-750).doc.doc53 KB
- DownloadAttachment G-BERTHOLF DS FQ2 FY27 - WI 2 and WI 6 JOTFOC REDACTED.pdf.pdf297 KB
- DownloadSF1449 BERTHOLF DS FQ2 FY27_70Z08526QLREP0023.pdf.pdf150 KB
- DownloadAttachment C - Request for Clarification USCGC BERTHOLF (WMSL-750).docx.docx21 KB
Contacts
Similar contracts
- NOTICE OF INTENT TO SOLE SOURCE CGC SAGINAW CRANE WINCHAlabamaDue Aug 18, 2026
- Flowserve HPU Cooling Pump for Dredge EssayonsDue Aug 17, 2026
- MDC 3372 Key Woods Towboat ReplacementDue Sep 14, 2026
- DOCKSIDE: USCGC ALERT DS1 FY27FloridaDue Aug 21, 2026
- Scaffolding on Bridge Face for Ship's Force Use; rigNagasakiDue Aug 31, 2026
- Tug Demolen DrydockDue Aug 31, 2026