SR Power Supplies Rack Detailed Design for ALS-U
- Response deadline
- Oct 20, 2026 Due in 13 days
- Date posted
- Oct 6, 2026
- Source
- Open notice
Description
LBNL will host an optional pre-proposal conference on 10/8/26 at 9AM PST where our Technical Team will walk through the SOW and clarify any information. Attendance is optional and will not be evaluated negatively against any submitted proposal. The conference is intended to be recorded and publicized after it concludes. Zoom Link to Join: https://lbnl.zoom.us/j/96572122335?pwd=bnvAr1SDfR0cMsTkh0ZnPYeLnAAseM.1 All other terms and conditions of this RFP remain the same. ______________________________________________________________________ This RFP has been revised 10/1/26 to extend the proposal due date until Monday October 19, 2026. All other terms and conditions of this RFP remain the same. ______________________________________________________________________ This RFP has been revised 9/25/26 to include a Questions & Clarifications (QA) document No. 4. All other terms and conditions of this RFP remain the same. ______________________________________________________________________ This RFP has been revised 9/23/26 to include a Questions & Clarifications (QA) document No. 3. All other terms and conditions of this RFP remain the same. ______________________________________________________________________ This RFP has been revised 9/22/26 to include a Questions & Clarifications (QA) document No. 2. All other terms and conditions of this RFP remain the same. ______________________________________________________________________ This RFP has been revised 9/20/26 to include a Questions & Clarifications (QA) document. All other terms and conditions of this RFP remain the same. ______________________________________________________________________ Dear Prospective Offeror, The University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in Request for Proposal (RFP) No. AA-2027-01 for ALS-U Storage Ring Power Supplies Rack Designs. The RFP and associated documents (listed below) are attached hereto: 0. RFP and Proposal Preparation Instructions 1. Statement of Work; inclusive of all referenced documents. Please view the following Google Drive for complete Technical documentation: https://drive.google.com/drive/u/0/folders/1lVLQphc5On3Uki29Zgcj63Htsmv-ZnUj 2. Sample Subcontract 3. ALS-U Quality Evaluation Survey (required with submission) 4. Rep Cert Form (required with submission) Timeline of Events: Questions for Clarification - no later than September 24, 2026 Pre-Proposal Conference - Week of September 28, 2026, if necessary Submissions due - no later than October 2, 2026.
Classifications
Documents (9)
- QA RFP AA-2027-01 No. 3.pdf.pdf84 KBNot yet available
- 3. ALS-U Supplier Quality Evaluation Survey, RFP AA-2027-01.pdf.pdf1.2 MBNot yet available
- 0. RFP, AA-2027-01.pdf.pdf284 KBNot yet available
- 2. Sample Subcontract, AA-2027-01.pdf.pdf246 KBNot yet available
- 4. Standard Form Rep Cert, RFP AA-2027-01.docx.docx66 KBNot yet available
- 1. SOW, AL-1964-3328A.pdf.pdf982 KBNot yet available
- QA RFP AA-2027-01 No. 4.pdf.pdf69 KBNot yet available
- QA RFP AA-2027-01 No. 2.pdf.pdf60 KBNot yet available
- QA RFP AA-2027-01.pdf.pdf40 KBNot yet available
Contacts
Similar contracts
- 84 Radar Evaluation Squadron (RADES) SupportUtahDue Oct 27, 2026
- Engineering Services for the B-52H StratofortressOklahomaDue Nov 6, 2026
- LARS Hardware RefreshDue Oct 21, 2026
- SB Set-Aside under Seaport – Battle Watch Support Services for CNICDue Oct 12, 2026
- Justification: F-15 Specialized Engineering and Technical Services/Avionics Systems Supportability Analysis ProgramGeorgia
- NUWC Division, Keyport and NSLC Mechanicsburg SeaPort/Service Contract Forecast