SLD 30 CES BLD 10577 Carpet Removal and Replacement
- Response deadline
- Sep 10, 2026 Due in 6 days
- Date posted
- Sep 4, 2026
- Source
- Open notice
Description
***RFI Reponses are now included as a solicitation attachment.*** BE ADVISED. The worksite location associated with this contract opprotunity is a secure and restricted area. ELECTRONIC DEVICES ARE PROHIBITED INSIDE THE WORKSITE AT ALL TIMES. This is a combined synopsis/solicitation for commercial carpet installation and removal services prepared in accordance with the format in RFO subpart 12.202, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation will not be issued. See Attachment 1 – Performance Work Statement (A1 - 30 CES Carpet PWS B10577 1Jun26.pdf), for detailed description of services required. A Site Visit will be conducted on 1 September 2026 at 9:00 AM (PST). Please arrive at the Vandenberg SFB Visitor Control Center located at 6 California Blvd, Vandenberg Space Force Base, CA 93437 at least one hour prior to allow time for in-processing. The site visit will take place at Building 10577, Vandenberg SFB, CA. If you require base access, please contact the Contracting Officer to arrange your pass no later than 3:00 PM (PST) 26 August 2026. Any questions are due no later than: 1:00 PM (PST) 3 September 2026 Quotes are due no later than: 1:00 PM (PST) 10 September 2026
Classifications
Documents (9)
- A5 - WD No.2015-5647 rev27 dtd 20260513.pdf.pdf4.2 MBNot yet available
- SLD 30_CES B10577 Carpet Combo Synop 18AUG2026.pdf.pdf188 KBNot yet available
- A1 - 30 CES Carpet PWS B10577 1Jun26.pdf.pdf212 KBNot yet available
- A6 - VSFB-Limited Asbestos Survey-B383534_B10577 C-Wing.pdf.pdf408 KBNot yet available
- A7 - Clauses and Provisions_FA461026Q0047.pdf.pdf20 KBNot yet available
- A3 - SLD 30 CES Carpet Price Schedule.xlsx.xlsx28 KBNot yet available
- BLD 10577 Carpet Removal and Replacement_RFI Responses .pdf.pdf82 KBNot yet available
- A2 - BLD10577-C-WING-Carpet Plan_17AUG2026.pdf.pdf223 KBNot yet available
- A4 - Tier 1 POC.pdf.pdf36 KBNot yet available
Contacts
Similar contracts
- Remove & Replace Carpet in Office and Conference Room Stoneville, MSMississippiDue Sep 14, 2026
- 57 MXG FlooringNevadaDue Sep 18, 2026
- 175th Wing MDANG Epoxy Floor Bldg. 3010 WarehouseMarylandDue Sep 15, 2026
- Carpeting Removal and InstallationTexasDue Sep 10, 2026
- USUN ReflooringRomaDue Sep 18, 2026
- 55 FSS TACFIT FlooringNebraskaDue Sep 21, 2026