Sector San Diego- UPH - 05 Bathrooms Renovation
- Response deadline
- Sep 19, 2026 Closed
- Date posted
- Sep 15, 2026
- Source
- Open notice
Description
PROJECT & ACQUISITION DETAILS Location: USCG Sector San Diego, 2710 N Harbor Dr, San Diego, CA 92101 Scope: Complete renovation of two (2) UPH bathrooms (approx. 120 sq. ft. each). Labor Standard: Davis-Bacon Act (DBA) Prevailing Wage Requirements (San Diego County, CA) Material Standard: Standard Commercial Grade Hazardous Material Policy: Non-disturbance of wall ACM; Lead-safe work practices and waste characterization for tile demolition required. WBS Element - Scope Description 1.0 Demolition & HAZMAT Lead-safe demo of flooring, fixtures, and partitions in 2 bathrooms. Includes containment, monitoring, and specialized waste characterization/disposal. 2.0 Flooring Furnish and install approx. 240 sq. ft. of new heavy-duty waterproof vinyl flooring. 3.0 Plumbing (New) Furnish and install all new toilets, urinals, sinks, showers, valves, and flushometers for two bathrooms. 4.0 Fixtures (New) Furnish and install new toilet partitions, shower pans, mirrors, and dispensers for two bathrooms. 5.0 Testing & Closeout Reconnect all utilities, perform full functional and leak testing with unit POC, and conduct final site cleanup. Please see attached SOW and report for further details and photo attachments for visuals. For site visits, CWO Justin Pritcher (Unit POC) has stated that he will have site visits for all interested vendors on Monday, September 14th @ 10am. Please have a REAL ID available to provide to security as that will be the access needed for entry. No paperwork is needed beforehand. Correct site address is listed above in the begining of this description.
Classifications
Documents (9)
- Bathroom 9-10_6.jpg.jpg4.7 MBNot yet available
- Bathroom 9-10_1.jpg.jpg4.2 MBNot yet available
- SOW_SEC SD UPH Bathroom Renovations.docx.docx41 KBNot yet available
- Bathroom 9-10_2.jpg.jpg1.9 MBNot yet available
- USCG Sector San Diego - Lead ACM Survey Report.pdf.pdf4.5 MBNot yet available
- Bathroom 9-10_5.jpg.jpg4.2 MBNot yet available
- Site Visit QA.docx.docx16 KBNot yet available
- Bathroom 9-10_4.jpg.jpg4.2 MBNot yet available
- Bathroom 9-10_3.jpg.jpg1.2 MBNot yet available
Contacts
Similar contracts
- Renovate Military Family Housing Tower 4511, Camp CourtneyDue Nov 30, 2026
- AFHC Repair Quarters 82 and 86, Camp Zama, JapanDue Dec 11, 2026
- Or Warm Springs Qtrs 4 Paint/FlooringDue Nov 25, 2026
- RTOIL Office rehabDue Oct 30, 2026
- RTOIL Office rehabDue Oct 30, 2026
- AFHC Repair Quarters 82 and 86, Camp Zama, JapanDue Dec 11, 2026