New Hogan Dam and Lake Restroom Replacement, Valley Springs, CA.
- Response deadline
- Sep 3, 2026 Due in 18 days
- Date posted
- Jul 30, 2026
- Source
- Open notice
Description
The anticipated requierment is for work to be performed at Acorn Campground, New Hogan Lake, Valley Springs, CA. Work will include removing one existing waterborne restroom; removal/disposal of any and all debris associated with the project to an offsite location; purchase and placement of one (1) new prefabricated concrete cast waterborne restroom; connection to existing utilities to include water, electrical and sewer. Includes delivery to the location, final utility connections, which will include all associated incidental requirements to complete installations that meet Americans with Disabilities Act (ADA) requirements and state and national building codes. This prospective contract action will be conducted using NAICS Code is 238910 – Site Preparation Contractors. The size standard is $19 million. Product Service Code is N054 – Installation of Equipment – Prefabricated Structures and Scaffolding. The solicitation will proceed as a 100% small business set-aside and is estimated to be issued on or about 08/04/2026 with quotes due tentatively on 09/03/2026. The RFQ will be issued on the Government Point of Entry known as www.SAM.gov and will establish a firm quote due date/time. If applicable, the site visit date, time and location will be identified in the solicitation. BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS. The only INTERESTED VENDORS LISTS (plan-holder's/bidder's list) is available via SAM.gov. Contractors are responsible for self-identifying as interested vendors and viewing other interested vendors. Contractors should check SAM.gov frequently for any changes to the interested vendors list and notice.
Classifications
Documents
No documents posted for this opportunity.
Contacts
Similar contracts
- FIELDS POINT COMPOSTING TOILETS UNIT INSTALLATION OKANOGAN-WENATCHEE NATIONAL FORESTWashingtonDue Aug 28, 2026
- ODF-H FY26 Asbestos Abatement and DemolitionNebraskaDue Aug 26, 2026
- Demo Mini mute sitesSouth CarolinaDue Aug 21, 2026
- Whatcom Ritter Road Equipment Rental with OperatorWashingtonDue Aug 21, 2026
- New Hogan Dam and Lake Restroom Replacement, Valley Springs, CA.CaliforniaDue Sep 1, 2026
- Cockreham Island Emergency Levee Repair – Equipment w/ OperatorWashingtonDue Aug 17, 2026